11. Pre-Season Checks
28
PNEG-1820CE
CE Compliant Top Dry Series 2000 Autoflow
Control Power Switch
Turn the control power switch ON. The switch will illuminate. If a fault is found an error message will be
displayed on the screen. If all are found safe, the main drying screen will be displayed.
Figure 11A Top Dry Component Placement
Ref #
Description
A
Aeration Fan
B
Fill System Control Box Mounted at Eye Level
C
Cable Route
D
Actuator
E
Autoflow Control Box Mounted at Eye Level
F
Slave Fan/heater
G
Storage Chamber Rotary Switch Mounted 3' Below Fan/heater
H
Master Fan/heater
I
Plenum Temperature Sensor
J
Air Switch
K
Drying Chamber Rotary Switches
L
Top Dry Drying Bin
F
an/he
ater #
2
F
an/
hea
ter
#1
Mount even with
fan/heater