5. Assemble the pin (16) through the clutch handle (30) and pivot bracket (29). If they do not align,
start the motor and pull the handle until the holes align and insert pin (16).
Figure 4-8
Locking the clutch handle
16
Lock pin
29
Clutch handle pivot
21
Clutch control rod
30
Clutch handle
CAUTION
The center well gate must be FULLY open during the bin sweep operation.
6. Restore power and start the power sweep motor. The sweep auger will start along with the unload
auger. The sweep auger will remain on the floor and clear most of the grain in one pass. A second
pass will clean out additional grain, before final clean out.
PNEG-2108
8" and 10" Standard Duty and IW Standard Duty
57