![GSi GrainVue Скачать руководство пользователя страница 26](http://html1.mh-extra.com/html/gsi/grainvue/grainvue_installation-manual_2275059026.webp)
Chapter 4: Installing the Cable Monitoring Hub
3. Install the mounting bracket (17) and Hub assembly onto the bin roof (27) by placing the mounting
bracket (17) down and allowing the pre-installed magnetic feet to attach to the bin roof (27).
NOTE:
The exact placement of the Hub (16) is flexible. In order to maximize sun exposure, the Hub
(16) should be placed on the south side of the bin roof (27), as illustrated in Detail A of
.
Figure 4-2
Installing the Hub assembly onto the bin roof
16
Cable Monitoring Hub
27
Bin roof
17
Mounting bracket
NOTE:
shows the electrical specifications for the Cable Monitoring Hub (16). This
information can also be found on the back face of the Hub (16).
Figure 4-3
Cable Monitoring Hub - electrical specifications
16
Cable Monitoring Hub
26
PNEG-2347
Cable Monitoring System
Содержание GrainVue
Страница 1: ...Cable Monitoring System Installation Manual PNEG 2347 Version 1 0 Date 11 01 21 PNEG 2347...
Страница 4: ...NOTES 4 PNEG 2347 Cable Monitoring System...
Страница 22: ...NOTES 22 PNEG 2347 Cable Monitoring System...
Страница 28: ...NOTES 28 PNEG 2347 Cable Monitoring System...
Страница 42: ...NOTES 42 PNEG 2347 Cable Monitoring System...
Страница 50: ...NOTES 50 PNEG 2347 Cable Monitoring System...
Страница 56: ...NOTES 56 PNEG 2347 Cable Monitoring System...