![GSi GrainVue Скачать руководство пользователя страница 19](http://html1.mh-extra.com/html/gsi/grainvue/grainvue_installation-manual_2275059019.webp)
Chapter 2: Gateway Installation
3. Install the ubiquiti pole (8) onto the gateway top bracket (5) using the three pre-installed U-bolt sets
(9).
Figure 2-6
Installing the ubiquiti pole
5
Gateway top bracket
9
U-bolt set
8
Ubiquiti pole
4. Install the WiFi and cell gateway kits.
a. For cell gateway kits: Install the LTE omnidirectional antenna (10) onto the ubiquiti pole (8) using
the pre-installed gear clamp (11).
Figure 2-7
Installing the LTE antenna
8
Ubiquiti pole
11
Gear clamp
10
LTE omnidirectional antenna
PNEG-2347
Cable Monitoring System
19
Содержание GrainVue
Страница 1: ...Cable Monitoring System Installation Manual PNEG 2347 Version 1 0 Date 11 01 21 PNEG 2347...
Страница 4: ...NOTES 4 PNEG 2347 Cable Monitoring System...
Страница 22: ...NOTES 22 PNEG 2347 Cable Monitoring System...
Страница 28: ...NOTES 28 PNEG 2347 Cable Monitoring System...
Страница 42: ...NOTES 42 PNEG 2347 Cable Monitoring System...
Страница 50: ...NOTES 50 PNEG 2347 Cable Monitoring System...
Страница 56: ...NOTES 56 PNEG 2347 Cable Monitoring System...