Chapter 2: Gateway Installation
3. Using four self-tapping screws (1), mount the Gateway PSU (2) onto an appropriate structure in the
location designated on your custom site map.
Figure 2-3
Installing the Gateway PSU
1
Self-tapping screws
14
Ethernet Cable
2
Gateway PSU
15
Power Cable
4. Plug the Power Cable (15) connected to the Gateway PSU (2), into an available power outlet
on-site.
NOTE:
The Ethernet Cable (14) will be connected in a later step.
Installing the Permanent Power Cable
WARNING
Only a certified electrician can complete the power supply installation. Make sure all
power sources are disconnected before performing any maintenance or service.
Always follow all national and local electrical and safety regulation for your area.
1. Disconnect and remove the temporary Power Cable (15) from the Gateway PSU (2) as shown in
.
2. Remove the installed cable gland (31) from the Gateway PSU (2) as shown in
.
3. Replace the removed cable gland (31) with an outdoor rated conduit fitting.
4. Run outdoor rated #14-12 AWG cable through the conduit fitting to the terminal block connections
as shown in
.
5. Connect the outdoor rated cable to a circuit protected by a 15 Amp circuit breaker.
PNEG-2347
Cable Monitoring System
17
Содержание GrainVue
Страница 1: ...Cable Monitoring System Installation Manual PNEG 2347 Version 1 0 Date 11 01 21 PNEG 2347...
Страница 4: ...NOTES 4 PNEG 2347 Cable Monitoring System...
Страница 22: ...NOTES 22 PNEG 2347 Cable Monitoring System...
Страница 28: ...NOTES 28 PNEG 2347 Cable Monitoring System...
Страница 42: ...NOTES 42 PNEG 2347 Cable Monitoring System...
Страница 50: ...NOTES 50 PNEG 2347 Cable Monitoring System...
Страница 56: ...NOTES 56 PNEG 2347 Cable Monitoring System...