5. Installation
PNEG-1162CEX
DMC DIII Stir-Ator
25
Figure 5AL Slip Ring Connections - 3 Phase Units
Figure 5AM Beam Box Wiring - 3 Phase Triple Auger Units
BEFORE PUTTING INTO SERVICE, THE INSTALLER MUST CHECK THAT ALL CABLE GLANDS AND
STRAIN RELIEFS ARE FULLY TIGHTENED.
NOTE:
Installer must ensure continuity of
low impedance protective earth circuit to all
conductive surfaces and electrical equipment.