Chapter 2: Installation Guidelines
To prevent the dryer from overturning or moving laterally, the dryer must be secured to the foundation
using anchor bolts or cables. Anchor bolts can be cast into the concrete slab and secured to the dryer
legs. The dryer can also be secured using cables and turnbuckles that are fastened to the anchors that
are installed at the edge of the concrete slab.
Table 2-1
General reference for concrete materials needed for each size dryer foundation.
Dryer basket length
14
16
18
20
22
26
Concrete pad size (ft x ft)
12 x 30
12 x 32
12 x 35
12 x 37
12 x 39
12 x 43
Concrete pad size (m x m)
3.7 x 8.5
3.7 x 9.1
3.7 x 10
3.7 x 11
3.7 x 11
3.7 x 12.5
Concrete yards (meters)
9.1 (8.3)
9.8 (9.0)
10.7
(9.8)
11.3 (10.3) 11.9 (10.9) 13.1 (12.0)
Quantity of reinforcing rods
20 ft. (6.1 m) each
9
9
10
11
11
12
Wire mesh ft
2
(m
2
)
359
(33.4)
383
(35.6)
419 (39)
443 (41.2)
467
(43.4)
515
(47.8)
Steel legs (minimum
quantity)
14
14
16
16
18
20
Anchors
8
8
10
10
10
12
Blocks
22
22
26
26
30
34
Feet (Meters) of 2 x 6
boards
22 (6.7)
22 (6.7)
26 (7.9)
26 (7.9)
30 (9.1)
34 (10.4)
Quantity of turnbuckles
8
8
10
10
10
12
Estimated man-hours
18
18
20
22
24
28
Quantities are approximate and requirements might vary due to site elevations.
Setup times do not include site preparations and the pouring of the concrete pad.
Figure 2-3
Recommended locations for external equipment
A
Grain discharge
area
B
Fill-hopper
C
Gas pipe
location
D
Electrical service
location
PNEG-2132
Pressure Cooled Quiet Portable Dryer