![GSI Group PNEG-1020 Скачать руководство пользователя страница 17](http://html1.mh-extra.com/html/gsi-group/pneg-1020/pneg-1020_installation-and-operation-manual_2275180017.webp)
PNEG-1020 Bin Sweep Auger
17
6" and 8" Bin Sweep Assembly & Installation
4.5 Install the Torque Tube
Clamp
1. Using four (4) 5/16" x 1" bolts, lock
washers, and nuts, attach the torque tube
clamps to the torque tube. Place the
torque tube clamps together first and
place the middle bolt on them to hold
them together. The tube will correspond
to the length of the sweep.
Figure 4.5-A
2. Slide the torque tube brackets onto the
torque tube. Do not tighten completely.
Figure 4.5-B
4.6 Install the Shield
1. Position the torque tube clamp
underneath the shield. Align holes in
torque tube clamps with holes in
backshield.
Figure 4.6-A
2. Tighten the bolts and nuts that hold the
tube to the torque tube clamps.
Figure 4.6-B
4.7 Install the Bearing Clamp
Brackets
1. Place a bronze bushing onto the flighting
shaft opposite the end of the motor mount
assembly. The middle bushing is already
pre-placed on longer models.
Figure 4.7-A
Torque Tube
Brackets
Torque Tube
Shield
Bronze Bushing