background image

1

384V500AH

640V2520AH

I Installation instruction

1.1 To carry or move

Lithium batteries in the carrying or movement process, should avoid inverted handling or

side sleeping handling, should be handled with care and to avoid collision

1.2 Open-box inspection

Check the battery for damage during transportation. Check the packing list (to actual

supply prevail)

N0.

Annex Name

Color/material/ specification Quantity Unit Remarks

1

Battery power cable

Black

168

Piece

2

Core acquisition cable

4 P through wall terminals

24

Piece

3 Communication between battery modules RJ 45 connector (network cable)

184

Piece

4

Communication cable

CAN cable

1

Piece

5

Grounding mark

φ5

Several Piece

6

Ground wire

Yellow green

Several Piece

7

Grounding screws

Stainless Steel

Combination M 5*12

Several Piece

8

Front shade panel

48

Piece

9

Front panel support

96

Piece

10

Front fixing screws

Several Piece

11

Battery Module Fixer

Stainless Steel

Combination M 5*12

Several Piece

12

Connector assembly (Orange)

184

Piece

13

Connector assembly (Black)

184

Piece

1.3 Installation

1.3.1 Confirm the installation environment and location

The battery needs to be installed in a ventilated and dry environment. Considering that

the battery adopts natural air cooling, the battery should not be too close to the source of
heat, so as to ensure the ambient temperature and maintenance space around the battery

It is forbidden to place batteries in any of the following environments.

High temperature Rainfall

Source of fire Corrosion

Slope

Содержание 640V2520AH

Страница 1: ...USER MANUAL 640V2520AH HIGH VOLTAGE LITHIUM IRON PHOSPHATE BATTERY Version 1 0 NEW ENERGY TECHNOLOGY LIFE CHANGING...

Страница 2: ...rface 10 2 5 Single cluster control interface 11 III Instructions for lithium battery charge 12 3 1 Electrical performance index 13 3 2 Instructions for use 13 IV Product profile 22 V Systemic stateme...

Страница 3: ...ing mark 5 Several Piece 6 Ground wire Yellow green Several Piece 7 Grounding screws Stainless Steel Combination M 5 12 Several Piece 8 Front shade panel 48 Piece 9 Front panel support 96 Piece 10 Fro...

Страница 4: ...pecified position and fix it pay attention to the direction of the battery rack and put the battery module on the shelf according to the battery layout diagram as shown below Partial drawing module wi...

Страница 5: ...3 384V500AH 640V2520AH Battery module layout and signal cable connection diagram Overall...

Страница 6: ...dule needs to charge and discharge separately so that the voltage difference is within 0 5 V When the battery module is connected in series use the battery connection we provide to ensure that the ter...

Страница 7: ...e positive voltage Close the battery breaker BAT SW of the fifth cluster power on the system with weak current and the display screen on the system cabinet starts to work press the ON OFF button switc...

Страница 8: ...1 pcs 8 Banding Black 1 Bag The system self check is correct the high voltage power on the system is running normally the running indicator RUN on the system cabinet is always on the battery informati...

Страница 9: ...play control screen function which can be used to solve the display control screen display data stuck screen 2 Chinese and English bilingual switching function 3 Cut into the main interface function 4...

Страница 10: ...icate in turn the actual number of high voltage access clusters the actual number of clusters with normal communication and the total number of clusters with full configuration 3 The last piece of dat...

Страница 11: ...election of cluster serial number to be queried Select to query the individual information of the cluster and enter the number selection by clicking the pop up keyboard 3 Switching interface function...

Страница 12: ...e information interface 2 3 2 Data display The position of each display data in the unit information interface is as shown below Detailed description of each display data 1 Display the general informa...

Страница 13: ...icate three level fault The severity of the fault level is 3 2 1 2 5 Single cluster control interface Click the strong control button on the main interface and enter the corresponding password in the...

Страница 14: ...be controlled click the strong control switch button to turn it on and if it succeeds the corresponding cluster indicator in the lower display box will light up green click the dry contact of charge...

Страница 15: ...SP LI 80V50A Input power three phase 380Vac 45 65HZ Input current 10A Input power 5KVA Output voltage range 30 100V Output current range 5 50A Rated power 4KW Product size 560 430 600 mm Weight 50KG P...

Страница 16: ...fix the switch on the rear panel to complete the wiring A The input terminal yellow green and red is connected to three phase power B The output terminal red and black is connected to the lithium bat...

Страница 17: ...00AH 640V2520AH As shown in the figure 3 2 2 Display description A After booting the panel will display the following The main interface will display the basic information of the machine and fault inf...

Страница 18: ...16 16 640V2520AH B On the main screen click the upper left corner to enter the maintenance options as Follows Maintenance options include parameter settings...

Страница 19: ...17 384V500AH 640V2520AH Enter the management password 123456 and enter the settings Then enter the password setting you can modify the password to ensure safety...

Страница 20: ...e settings You can set the system minimum voltage maximum current maximum voltage and BMS voltage into the protection settings which can limit the output over voltage output under voltage and output o...

Страница 21: ...19 384V500AH 640V2520AH Time setting you can calibrate the current system time Debug mode The charging voltage and charging current can be set...

Страница 22: ...0 20 640V2520AH Pile information Display the basic information of the machine Alarm query You can directly see the record of the last failure inside select other to see more historical failure records...

Страница 23: ...arging electricty You can set timed charging more humane and finally click back to return to the main interface C Click the battery directly to see the ID information message data and the set voltage...

Страница 24: ...me high voltage energy storage high voltage UPS and data room The product adopts modular design higher integration saving installation space adopts high performance lithium iron phosphate cathode mate...

Страница 25: ...BMU Master slave communication 4 48 series single cell voltage acquisition 4 channels channel temperature acquisition CSU Current sampling support Hall sensor and JDI shunt Wire harness Voltage detec...

Страница 26: ...temperature SOC SOH and other threshold alarm functions as well as limit alarm threshold circuit cut off protection function Support data storage function support local storage of system operating da...

Страница 27: ...25 384V500AH 640V2520AH power down save function 5 4 Product Graphics and Technical Parameters Battery module Battery cluster Stack only for sample showing...

Страница 28: ...387 410 Recommended discharge cutoff voltage VDC 92 183 210 342 366 Standard charging current A 40 80 40 80 40 80 40 80 40 80 Maximum continuous charge current A 100 200 100 200 100 200 100 200 100 2...

Страница 29: ...ng upper computer function window VCC voltage is equal to Key ON or charge detection signal If the difference is too large more than 3V please contact BMS manufacturer for support Charger output volta...

Страница 30: ...lick on monomer information to enter the monomer information interface which is mainly used as the visual display area of cell voltage and temperature information Calibration interface password jdi 12...

Страница 31: ...her metal items Use tools with insulated handles 6 2 Notes A The battery management system cannot be used in series B When using the battery management system the charging and discharging cabinet abov...

Страница 32: ...atic rain sprinkler system under conditions It can not be placed in the same warehouse with flammable materials e g packing materials cartons cartons etc it is recommended to use a separate warehouse...

Страница 33: ...termined that it can not be repaired After the completion of the waste application timely notification of professional qualifications of the disposal unit B for the bad battery in the storage period i...

Страница 34: ...ll be owned by the factory Product warranty services do not include damage due to Damage to equipment during transportation except for transportation by the factory Damage caused by improper installat...

Страница 35: ......

Страница 36: ...High Voltage Lithium Iron Phosphate Battery...

Отзывы: