2. General Descriptions  

 

Operation

 

 Assume the dryer has completed re-pressurization and the left tower has begun drying. The inlet 

compressed air/gas enters the dryer and is diverted to the lift tower to begin the five minute 

drying cycle.  Approximately five seconds later the right tower purge (regeneration) exhaust valve 

will open depressurizing the off-line tower. The purge flow will continue for a period of three 

minutes and fifty-five seconds. When regeneration of the off-line tower is complete, the purge 

exhaust valve will close, initiating the sixty second re-pressurization phase. After re-

pressurization is complete, the inlet selector valve will switch inlet valves and the inlet air/gas 

stream will divert from the left tower to the right tower. After five seconds the left tower purge 

exhaust valve will continuously cycle through the sequence described above until power is 

removed from the dryer.  

(See Appendix Sequence Chart) 

The complete standard operating (NEMA) cycle is ten minutes. Under normal conditions and 

during normal operation, the dryer should provide on outlet pressure dew point (ADP) of -40

 or 

below. 

 

 

Repressurizing Solenoid Valve 

 Repressurizing solenoid valve is installed  Large capacity model to prevent break of activated 

alumina gel. 

 

 

Fault Alarm 

 Pressure switch will transmit a outlet low pressure signal to DCS or local control panel. Then 

Purge solenoid valve is closed by control unit(in local control panel) 

Содержание Desiccant

Страница 1: ...lease read this manual before using this equipment must Learn all the safety precautions before using this equipment please keep Desiccant Air Dryer Heatless Type Operating Manual http www gsadryer co...

Страница 2: ...5 Light 5 Sound Pressure Level 5 Chapter 2 2 General Descriptions Purpose 6 Composition 6 Principle of Operation 6 Operation 7 Repressurizing Solenoid Valve 7 Fault Alarm 7 Chapter 3 Installation Wiri...

Страница 3: ...r 11 Control Air Filter 11 Purge Flow Rate Adjustment 11 Solenoid Valve 12 Desiccant Replacement 12 Maintenance Schedule 13 Troubleshooting 14 Chapter 6 Appendix Control Panel 15 Purge Air Calibration...

Страница 4: ...d in these operating instructions We recommend receipt and notice of these operating instructions verified by the operating personnel in writing personnel file We request strict observation of these n...

Страница 5: ...y the factory in accordance with the appropriate code of practice and factory regulations Sound Pressure Level If the sound pressure level is larger proper safety method is needed to the operator such...

Страница 6: ...pneumatic valve check valve solenoid valve and control panel The compressed air with moisture vapor enters a tower and flows upward through the desiccant bed The desiccant has great affinity for mois...

Страница 7: ...plete the inlet selector valve will switch inlet valves and the inlet air gas stream will divert from the left tower to the right tower After five seconds the left tower purge exhaust valve will conti...

Страница 8: ...nt suppression will decrease Operation of the dryer in ambient approaching freezing could cause freezing of separated liquids in the pre filter sump or in the dryer itself For dryer operation at tempe...

Страница 9: ...stream demand for dry air frequently occurs a rapid pressure loss in the compressed air system is possible To prevent this it is recommended that a back pressure regulator be installed down stream fr...

Страница 10: ...t one tower will depressurize to atmospheric pressure Regenerating purge air will then flow through the regenerating tower 5 Set the purge adjustment valve to 45 psig 3 1 barg The purge pressure can b...

Страница 11: ...nt Replacement of the element will enhance system operation and prevent inflow of desiccant powder to load side Control air filter The control air filter should be inspected periodically and replaced...

Страница 12: ...m to verify that the solenoid coil is receiving electrical input A burned out coil Replace the coil Clogged solenoid valve Disassemble and clean Damaged valve seat Disassemble and clean Desiccant repl...

Страница 13: ...ntaminants Replace if contaminated Control air filter Inspect filter element or regulator if needed clean the filter regulator Every 6 months Calibrate dew point meter if installed Refer to dew point...

Страница 14: ...lose Check de press purge valve And check its solenoid valve Excessive press drop Excessive flow rate Check working pressure Low Inlet pressure Check line pressure Tower change failure No control air...

Страница 15: ...SV1 B Tower Right Tower On Line SV2 B Tower Right Tower Purge SV3 A Tower Left Tower On Line SV4 A Tower Left Tower Purge SV5 Re Pressure Tower Select A or B Tower Select DPOS Dew Point Operating Sys...

Страница 16: ...ibration Chart 60 50 40 30 20 10 10 20 30 40 50 60 70 80 90 100 110 120 130 RATED FLOW OR NORMAL CAPACITY PURGE PRESSURE PSIG 5 0 6 0 70 80 90 100 110 120 130 140 150 Sequence chart 5 minutes drying c...

Страница 17: ...2017 05 GSA CO Ltd Head office Factory 679 2 Sinwol ri chowol eup Gwangju si Gyeonggi do KOREA TEL 82 31 798 0171 FAX 82 31 798 0175 www gsadryer com E mail gsa gsadryer com...

Отзывы: