6. Appendix
■
Control Panel
SV1
–
[B-Tower] Right Tower On-Line
SV2
–
[B-Tower] Right Tower Purge
SV3
–
[A-Tower] Left Tower On-Line
SV4
–
[A-Tower] Left Tower Purge
SV5
–
Re-Pressure
Tower Select
–
A or B Tower Select
DPOS
–
Dew Point Operating System
PRSS.
–
Repressurize
15