GSA Desiccant Скачать руководство пользователя страница 10

4. Operating 

 Start-Up

 

After all installation procedures are performed, drain water from the system prior to dryer start up. 

This will prevent saturation of the desiccant bed and improve performance of the dryer. 

1. The inlet shutoff valve open, the outlet shutoff valve & bypass valve close. 

2. Before to turning the dryer control panel switch ON, pressurize the dryer by slowly opening the 

Inlet shutoff of the dryer.  

3. When both tower pressure gauges indicate line pressure, open the outlet shutoff valve. 

Compressed air now flows through the pre-filter, the dryer and the after filter. 

4. Switch the control panel power switch ON. Five seconds after activating the dryer control 

circuit, one tower will depressurize to atmospheric pressure. Regenerating purge air will then flow 

through the regenerating tower. 

5. Set the purge adjustment valve to 45 psig (3.1 barg). The purge pressure can be properly set 

only the purge exhaust valve is open and the regenerating tower is at atmospheric pressure. 

(See Appendix Purge Air Calibration Chart) 

 

 

 

 

 

 

 Stop 

To stop the dryer, place the switch in off.  

During maintenance of dryer, disconnect main electrical source. 

10 

 

Caution!

 

 

Sudden pressurization of the dryer will cause a rush of high velocity air into the 

 

desiccant bed. This will hasten the need for after filter element and desiccant 

 

replacement and may cause premature failure of valves due to desiccant fines. 

 

Must keep the purge pressure : 3.0~3.5barg.  

 

Caution!

 

 

Do not operate the air dryer before purge air exhaust. 

 

Damage caused by this is not covered by the product warranty.

 

Содержание Desiccant

Страница 1: ...lease read this manual before using this equipment must Learn all the safety precautions before using this equipment please keep Desiccant Air Dryer Heatless Type Operating Manual http www gsadryer co...

Страница 2: ...5 Light 5 Sound Pressure Level 5 Chapter 2 2 General Descriptions Purpose 6 Composition 6 Principle of Operation 6 Operation 7 Repressurizing Solenoid Valve 7 Fault Alarm 7 Chapter 3 Installation Wiri...

Страница 3: ...r 11 Control Air Filter 11 Purge Flow Rate Adjustment 11 Solenoid Valve 12 Desiccant Replacement 12 Maintenance Schedule 13 Troubleshooting 14 Chapter 6 Appendix Control Panel 15 Purge Air Calibration...

Страница 4: ...d in these operating instructions We recommend receipt and notice of these operating instructions verified by the operating personnel in writing personnel file We request strict observation of these n...

Страница 5: ...y the factory in accordance with the appropriate code of practice and factory regulations Sound Pressure Level If the sound pressure level is larger proper safety method is needed to the operator such...

Страница 6: ...pneumatic valve check valve solenoid valve and control panel The compressed air with moisture vapor enters a tower and flows upward through the desiccant bed The desiccant has great affinity for mois...

Страница 7: ...plete the inlet selector valve will switch inlet valves and the inlet air gas stream will divert from the left tower to the right tower After five seconds the left tower purge exhaust valve will conti...

Страница 8: ...nt suppression will decrease Operation of the dryer in ambient approaching freezing could cause freezing of separated liquids in the pre filter sump or in the dryer itself For dryer operation at tempe...

Страница 9: ...stream demand for dry air frequently occurs a rapid pressure loss in the compressed air system is possible To prevent this it is recommended that a back pressure regulator be installed down stream fr...

Страница 10: ...t one tower will depressurize to atmospheric pressure Regenerating purge air will then flow through the regenerating tower 5 Set the purge adjustment valve to 45 psig 3 1 barg The purge pressure can b...

Страница 11: ...nt Replacement of the element will enhance system operation and prevent inflow of desiccant powder to load side Control air filter The control air filter should be inspected periodically and replaced...

Страница 12: ...m to verify that the solenoid coil is receiving electrical input A burned out coil Replace the coil Clogged solenoid valve Disassemble and clean Damaged valve seat Disassemble and clean Desiccant repl...

Страница 13: ...ntaminants Replace if contaminated Control air filter Inspect filter element or regulator if needed clean the filter regulator Every 6 months Calibrate dew point meter if installed Refer to dew point...

Страница 14: ...lose Check de press purge valve And check its solenoid valve Excessive press drop Excessive flow rate Check working pressure Low Inlet pressure Check line pressure Tower change failure No control air...

Страница 15: ...SV1 B Tower Right Tower On Line SV2 B Tower Right Tower Purge SV3 A Tower Left Tower On Line SV4 A Tower Left Tower Purge SV5 Re Pressure Tower Select A or B Tower Select DPOS Dew Point Operating Sys...

Страница 16: ...ibration Chart 60 50 40 30 20 10 10 20 30 40 50 60 70 80 90 100 110 120 130 RATED FLOW OR NORMAL CAPACITY PURGE PRESSURE PSIG 5 0 6 0 70 80 90 100 110 120 130 140 150 Sequence chart 5 minutes drying c...

Страница 17: ...2017 05 GSA CO Ltd Head office Factory 679 2 Sinwol ri chowol eup Gwangju si Gyeonggi do KOREA TEL 82 31 798 0171 FAX 82 31 798 0175 www gsadryer com E mail gsa gsadryer com...

Отзывы: