background image

English (GB)

7

4. Identification

4.1 Type key, PUST04 - PUST10

4.2 Type key, PUST17

4.3 Nameplate

Fig. 2

Nameplate

5. Pit versions

The pits come with pipes and valves, depending of the installation 
selected. Some pumps are available with a float switch connected 
directly to the pump and thus require no external or built-in 
controller.

The following installation drawings show pits with a free-standing 
pump, a pump on auto coupling, a pump on wall-mounted auto 
coupling and a pit with two pumps.

Example

PUST 08. 20. S. A. SS. SEG

Grundfos pumping station (standard)

Diameter [mm]
04:

400

06:

600

08:

800

10:

1000

Length [mm]
15:

1500

20:

2000

25:

500

30:

3000

S:

One pump

D:

Two pumps

Installation of pump
A:

Auto coupling on tank bottom

W:

Auto coupling on tank wall

S:

Free-standing

Pipe material
PE:

Polyethylene

SS:

Stainless steel AISI 304

Prepared for pump type
KP:

Unilift KP, Unilift CC

AP35: Unilift AP12.40, Unilift AP35
AP50: Unilift AP12.50, Unilift AP50
APB:

Unilift AP35B, Unilift AP50B

DPEF: DP (0.6 - 1.5 kW), EF
DPSE: DP (2.6 kW), SL1.50.65 and SLV.65.65 (up to 3 kW)
SEG: SEG

Example

PUST

17. 45. D. A. SS. DC. PE.

80

Grundfos pumping station 
(standard)

Diameter [mm]
17:

 1700

Length [mm]
20:

2000

25:

2500

30:

3000

35:

3500

40:

4000

45:

4500

50:

5000

55:

5500

60:

6000

S:

One pump

D:

Two pumps

T:

Three pumps

Installation of pump
A:

Auto coupling on tank bottom

S:

Free-standing

Pipe material
PE:

Polyethylene

SS:

Stainless steel

Pipe design
DC:

Direct outlet, common

DS:

Direct outlet, separate

GC:

Goose neck, common

NV:

No valves

Pit material
GR:

Glass-reinforced plastic

PE:

Polyethylene

CO:

Concrete

Internal pipe diameter
65:

DN 65 (2 1/2")

80:

DN 80 (3")

100: DN 100 (4")
150: DN 150 (5")
200: DN 200 (6")

TM

03

 40

29

 14

06

Pos.

Description

Type

Type designation

Part No.

Product number

P.c.

Year-week code

Type:

96574128

Made in Denmark
DK-8850 Bjerringbro

Part No./

P.c.

Содержание PUST04

Страница 1: ...t be led into the pit See also the installation and operating instructions of the pump 3 1 4 Density Maximum 1 1 tons m3 1 Symbols used in this document 6 2 General description 6 3 Applications 6 3 1...

Страница 2: ...inless steel AISI 304 Prepared for pump type KP Unilift KP Unilift CC AP35 Unilift AP12 40 Unilift AP35 AP50 Unilift AP12 50 Unilift AP50 APB Unilift AP35B Unilift AP50B DPEF DP 0 6 1 5 kW EF DPSE DP...

Страница 3: ...B 8 TM02 9364 2404 TM02 9363 2404 Fig 3 Pit with free standing pump Fig 4 Pit with pump on auto coupling TM02 9366 2404 TM02 9365 2404 Fig 5 Pit with pump on wall mounted auto coupling Fig 6 Pit with...

Страница 4: ...viest standard pit weighing approximately 1000 kg 7 Sizing The pit volume depends on the wastewater flow rate and the pump performance If the liquid in the pit is static during long periods sediments...

Страница 5: ...The backfill must meet the same requirements as those for the bedding layer The backfilling must be carried out so that the pit is not damaged or deformed The backfill must be compacted in layers of m...

Страница 6: ...cutting edge of the hole saw by at least 23 mm The position of the hole is not an issue See fig 17 Fig 17 Drillilng from the inside Caution If the hole for the pit is drilled pay special attention to...

Страница 7: ...he start level switch should be installed in such a way that the pump is started at the required level however the pump must always be started before the liquid level reaches the lower edge of the bot...

Страница 8: ...lse generators for the pressure switches of the controller and function by means of pneumatic pressure changes The pressure changes when the liquid level in a pickup changes The air bells are connecte...

Страница 9: ...oduct or parts of it must be disposed of in an environmentally sound way 1 Use the public or private waste collection service 2 If this is not possible contact the nearest Grundfos company or service...

Отзывы: