![Grundfos AQC-D5 Скачать руководство пользователя страница 4](http://html1.mh-extra.com/html/grundfos/aqc-d5/aqc-d5_installation-and-operating-instructions-manual_2271579004.webp)
English (GB)
4
English (GB)
Installation and operating instructions
Original installation and operating instructions
CONTENTS
Page
1. Symbols used in this document
2. Identification
2.1 Nameplate
Fig. 1
Nameplate, AQC-D5 preassembled system
Type key, AQC-D5 preassembled system
Obligations of the owner/operations manager
Functional principle of measurement
Dimensional sketch / drilling diagram
Checking magnetic stirring stone and filling in cleaning
ball
Screwing in potentiostatic electrode
Installation of temperature sensor Pt100
Installation of the sample water deficiency sensor
9.10 Commissioning of the measuring cell
10.1 Photometrical measurement
11.3 Adjusting the sample water flow
13.1 Intervals for cleaning and maintenance
13.2 Exchanging the tube of the peristaltic pump
13.4 Cleaning measuring cell AQC-D5
Warning
These complete installation and operating
instructions are also available on www.grundfos.com.
Prior to installation, read these installation and
operating instructions. Installation and operation
must comply with local regulations and accepted
codes of good practice.
Warning
If these safety instructions are not observed, it may
result in personal injury!
Caution
If these safety instructions are not observed, it may
result in malfunction or damage to the equipment!
Note
Notes or instructions that make the job easier and
ensure safe operation.
TM0
4
130
4
2
5
0
9
Pos.
Description
1
Type designation
2
Model
3
Product name
4
Voltage [V]
5
Frequency [Hz]
6
Product number
7
Country of origin
8
Year and week of production
9
Marks of approval, CE mark, etc.
10
Power consumption [VA]
11
Enclosure class
12
Serial number
DIA-1-A D5-AU-X-QS-T, W-G
314-350-10002
S/N: 10/06187
Conex DIA-1 preassembled
230/240V 50/60Hz, 32 VA, IP 65
95700900P1109251006187
1
2
3
4
5
7
8
9
10
11
12
6