Installation Procedures

                               Installation Procedures

Page 8

General
Note: Do not lower or lift the pump by means of the motor cable.

The loose data plate supplied with the pump should be placed close to the
installation site.

12. Installing the cable plug to
the motor

To install the cable plug, proceed as follows:

1.Check that the cable is of the correct type,

cross-section and length.

2.Check that the mains on the location has

correct connection to ground.

3.Check that the motor socket is clean and dry.
4.Press the cable plug into the motor socket.

The plug will only fit one way, see fig. 6.

5.Install and tighten the four nuts, see fig. 6.

When the plug has been installed, there must
not be a clearance between the motor and the
cable plug.

13. Installing the
cable guard

To fit the cable guard, proceed as
follows:

1. Make sure that the motor lead

lies flat in the cable guard.

2. The two flaps of the cable

guard must engage with the
upper edge of the pump
sleeve, see fig. 7.

3. Fasten the cable guard to the cable
plug with the four screws supplied, see
fig. 8.

Fig. 7

Fig. 8

Fig. 6

A

B

C

D

E

14. Piping

The pump should only be gripped by the
two flats at the top of the pump, as
shown in fig. 9.

The pump can be installed vertically or
horizontally.  During operation, the pump
must always be completely submerged
in water.

When plastic pipe is used, a stainless
steel safety wire is recommended for
lowering and lifting the pump. Fasten
the wire to the eyelet on the pump, as
shown in fig. 10.

The threaded joints must be well cut
and fit together tightly to ensure that
they do not work loose.

15. Installing the Pump

Installation Depth

The dynamic water level should always be
above the pump see fig. 11.

A = Dynamic water level
B = Static Water Level
C = Minimum 3" well diameter
D = Drawdown
E = Installation depth below static

water level. Maximum 500 feet

Procedures

To install the pump, follow these steps:

1. Install the enclosed data plate sticker at

the well head.

2. Check the well for proper clearance — the

well must be at least 3" in diameter.   It is
a good idea to check the well for
clearance using a plumb ring (2.95 ø x 10
in.).

3. Attach the first section of riser pipe to the

pump.

Fig. 9

Fig. 10

Fig. 11

Page 7

Содержание 10SQE03A-100-NE

Страница 1: ...t Permanent Magnet Motor High Starting Torque Soft Start 2 seconds to reach maximum rpm and maximum pressure Built in Smart Motor Protection with automatic restart Communication Through the Redi Flo3...

Страница 2: ...ORANYINCIDENTALORCONSEQUENTIAL DAMAGES LOSSES OR EXPENSES ARISING FROM INSTALLATION USE OR ANY OTHERCAUSES THEREARENOEXPRESSORIMPLIEDWARRANTIES INCLUDING MERCHANTABILITY OR FITNESS FOR A PARTICULAR PU...

Страница 3: ...p life and optimal performance can best be obtained through proper well development and in the case of higher fluid temperatures use a cooling shroud A check should be made to ensure that the installa...

Страница 4: ...uid It is recommended to check and if needed refill the motor with GRUNDFOS motor fluid SML 2 If the pump is to be installed horizontally e g in a tank and there is a risk that the pump might be cover...

Страница 5: ...l position with an inclination of approx 10 3 Remove the filling plug using a screwdriver or a similar tool 4 Inject motor liquid into the motor with a filling syringe or similar tool see fig 3 5 To a...

Страница 6: ...the pump is connected to an installation where a Ground Fault circuit breaker GFI is used as additional protection this circuit breaker must trip out when ground fault currents with DC content pulsat...

Страница 7: ...trol box should NEVER be connected to a Redi Flo3 submersible pump WARNING To reduce the risk of electric shock during operation of this pump requires the provision of acceptable grounding If the mean...

Страница 8: ...50 1020 1610 2510 3880 5880 3 4 300 480 760 1200 1870 2890 4370 6470 1 250 400 630 990 1540 2380 3610 5360 6520 1 1 2 190 310 480 770 1200 1870 2850 4280 5240 10 Cable Sizing 11 Motor Cable Redi Flo3...

Страница 9: ...Check that the motor socket is clean and dry 4 Press the cable plug into the motor socket The plug will only fit one way see fig 6 5 Install and tighten the four nuts see fig 6 When the plug has been...

Страница 10: ...l cut and fit together tightly to ensure that they do not work loose 15 Installing the Pump Installation Depth The dynamic water level should always be above the pump see fig 11 A Dynamic water level...

Страница 11: ...e correct size generator for the motor HP 16 Installing the Pump cont 4 Lower the pump into the well Make sure the motor cable is not damaged when the pump is lifted or lowered into the well especiall...

Страница 12: ...denly falls the reason might be that the pump is pumping more water than the well can yield Water Impurities If there are impurities in the water the valve should be opened gradually as the water beco...

Страница 13: ...overload overtemperature MSE 3NE Motors Note To set Dry Run limit in the MSE NE pumps you need to connect the pump to a Redi Flo3 status box Refer to Redi Flo3 status box I O for proper connections To...

Страница 14: ...shaft end with a vegetable based grease 3 Screw the pump end on the motor A spanner may be used on the clamping faces of the pump part see fig 12 4 Install cable guard as described on page 7 When pump...

Страница 15: ...is larger than anticipated capacity b The valve s in the discharge pipe are partly closed blocked c The discharge pipe is partly chocked by impurities Iron bacteria d The non return valve of the pump...

Страница 16: ...e the valve oked Pull out the pump Check and clean or replace the pump if necessary Clean the pipes Repair replace the pump Check and repair the piping Replace Check the electricity supply Increase th...

Страница 17: ...sed in the product please deliver the product or any hazardous materials from it to your nearest GRUNDFOS company or service center Insulation Test Resistance Test High voltage Test Measure the voltag...

Страница 18: ...15SQE NE 1 1 4 NPT 22 30SQE NE 1 1 2 NPT STORAGE CONDITIONS Minimum Ambient Temperature 4 F Maximum Ambient Temperature 140 F Freeze Protection If the pump has to be stored after use it must be store...

Страница 19: ...7 6 10SQE10C 260 NE 1 C 230V 7 6 10SQE10C 300 NE 1 C 230V 7 6 10SQE15C 340 NE 1 1 2 C 230V 11 1 15SQE03A 70 NE 1 3 A 230V 115V 3 9 7 8 15SQE05A 110 NE 1 2 A 230V 115V 4 9 9 8 15SQE05B 130 NE 1 2 B 23...

Страница 20: ...s SPP1 Potentiometer 625468 RediFlo3 Motor Leads available in 5ft increments See price list 25ft 96037428 50ft 96037429 75ft 96037430 100ft 96037431 125ft 96037432 150ft 96037433 175ft 96037434 200ft...

Отзывы: