Instruments not allowed:

Note: The use of the following instruments is not allowed during fault
finding:

Note: When measuring, use RMS-instruments.
Checking the motor and cable:

Environment
During handling, operation, storage and transport, all environment
regulations dealing with the handling of hazardous materials must be
observed.

When the pump is taken out of operation, it must be ensured
that no hazardous material is left in the pump and in the riser
pipe, which can be injurous to persons and the environment.

Disposal
Disposal of this product or parts of it must be carried out according to the
following guidelines:
1. Use the local public or private waste collection service.
2. If such waste collection service does not exist or cannot handle the

materials used in the product, please deliver the product or any
hazardous materials from it to your nearest GRUNDFOS company or
service center.

Technical Data

Insulation

Test

Resistance

Test

High-voltage

Test

Measure the voltage L1
(RMS) between phase
and L2. Connect the
voltmeter to the terminals
at the connections.

The voltage should, when the
motor is loaded, be within the
range specified on Page 4, large
variations in supply voltage
indicate poor electricity supply,
and the pump should be stopped
until the problem has been
corrected.

Measure the current (RMS)
while the pump is operating
at a constant discharge
head(if possible, at capacity
where the motor is heavily
loaded). For maximum
current, see motor
nameplate.

If the current exceeds the full load
current, there are the following
possible faults:
Poor connection in the leads,
possibly in the cable joint.
Too low supply voltage, see item 1
on Page 13.

Page 15

Page 16

s

upply Voltage:

1x200-240V  +6%/-10%, 50/60 Hz, PE

Operation via Generator:

 As a minimum, the generator output
must be equal to the motor P1[KW] +10%

Starting Current:

The motor starting current is equal to the
highest value stated on the motor nameplate

Starting:

Soft starting

Run-up Time:

Maximum : 2 seconds

Motor Protection:

The motor is protected against:
Dry running, overvoltage, undervoltage,
overload, overtemperature

Power Factor:

PF= 1

Service Factor:

0.33-0.50A[HP]-1.75 at 230V
0.50-0.75A[HP]-1.4 at 230V
 1.0 -1.5C[HP] -1.15  at 230V

Motor Cable:

3 Wire, 12 AWG TEFZEL

Length

Available in 5 ft. increments from 25ft.- 300ft.

Motor Liquid:

Type SML 2

pH Values:

Redi-Flo3:  5 to 9

Liquid Temperature:

The temperature of the pumped liquid must
not exceed 104°F.

Note:  if liquids with a viscosity higher than that of water are to be pumped,
please contact  GRUNDFOS

Discharge Port:

5SQE-NE- 1"NPT
10-15SQE-NE- 1 1/4" NPT
22-30SQE-NE- 1 1/2" NPT

STORAGE CONDITIONS

Minimum Ambient Temperature:

-4°F

Maximum Ambient Temperature:

+140°F

Freeze  Protection:

If the pump has to be stored after use, it
must be stored on a frost-free location or it
must be ensured that the motor liquid is
frost-proof.  (The motor must be stored
without being filled with motor liquid
.)

OPERATING CONDITIONS

Minimum Ambient Fluid Temperature:

34°F

Maximum Ambient Fluid Temperature:

+104°F

APPROXIMATE DIMENSIONS AND WEIGHT

Motor Dimensions (MSE3-NE):

0.33-0.50A[hp]

20.9" length x 2.68" diameter

0.50-0.75B[hp]

20.9" length x 2.68" diameter

1.0-1.5C[hp]

22.3" length x 2.68" diameter

Motor Weights (MSE3-NE):

0.33-0.50A[hp]

6.0 Lbs

0.50-0.75B[hp]

7.1 Lbs

1.0-1.5C[hp]

8.2 Lbs

Pump End Dimensions:

Pump Diameter:

2.68"

Pump Diameter, incl. cable guard:

2.91"

Pump End Dimensions(min. and max.):

5SQE-NE

8.1"  to 13.6"

10SQE-NE

8.1"  to 14.5"

15SQE-NE

8.1"  to 14.5"

22SQE-NE

8.1"  to 14.5"

30SQE-NE

8.1"  to 11.3"

Pump End  Weights(min. and max.):

All Redi-Flo3 Models

2.2 lbs to 3.5 lbs

 Well Diameter (minimum):

3"

Installation Depth (Maximum):

500 feet, below static water level.

Troubleshooting

Содержание 10SQE03A-100-NE

Страница 1: ...t Permanent Magnet Motor High Starting Torque Soft Start 2 seconds to reach maximum rpm and maximum pressure Built in Smart Motor Protection with automatic restart Communication Through the Redi Flo3...

Страница 2: ...ORANYINCIDENTALORCONSEQUENTIAL DAMAGES LOSSES OR EXPENSES ARISING FROM INSTALLATION USE OR ANY OTHERCAUSES THEREARENOEXPRESSORIMPLIEDWARRANTIES INCLUDING MERCHANTABILITY OR FITNESS FOR A PARTICULAR PU...

Страница 3: ...p life and optimal performance can best be obtained through proper well development and in the case of higher fluid temperatures use a cooling shroud A check should be made to ensure that the installa...

Страница 4: ...uid It is recommended to check and if needed refill the motor with GRUNDFOS motor fluid SML 2 If the pump is to be installed horizontally e g in a tank and there is a risk that the pump might be cover...

Страница 5: ...l position with an inclination of approx 10 3 Remove the filling plug using a screwdriver or a similar tool 4 Inject motor liquid into the motor with a filling syringe or similar tool see fig 3 5 To a...

Страница 6: ...the pump is connected to an installation where a Ground Fault circuit breaker GFI is used as additional protection this circuit breaker must trip out when ground fault currents with DC content pulsat...

Страница 7: ...trol box should NEVER be connected to a Redi Flo3 submersible pump WARNING To reduce the risk of electric shock during operation of this pump requires the provision of acceptable grounding If the mean...

Страница 8: ...50 1020 1610 2510 3880 5880 3 4 300 480 760 1200 1870 2890 4370 6470 1 250 400 630 990 1540 2380 3610 5360 6520 1 1 2 190 310 480 770 1200 1870 2850 4280 5240 10 Cable Sizing 11 Motor Cable Redi Flo3...

Страница 9: ...Check that the motor socket is clean and dry 4 Press the cable plug into the motor socket The plug will only fit one way see fig 6 5 Install and tighten the four nuts see fig 6 When the plug has been...

Страница 10: ...l cut and fit together tightly to ensure that they do not work loose 15 Installing the Pump Installation Depth The dynamic water level should always be above the pump see fig 11 A Dynamic water level...

Страница 11: ...e correct size generator for the motor HP 16 Installing the Pump cont 4 Lower the pump into the well Make sure the motor cable is not damaged when the pump is lifted or lowered into the well especiall...

Страница 12: ...denly falls the reason might be that the pump is pumping more water than the well can yield Water Impurities If there are impurities in the water the valve should be opened gradually as the water beco...

Страница 13: ...overload overtemperature MSE 3NE Motors Note To set Dry Run limit in the MSE NE pumps you need to connect the pump to a Redi Flo3 status box Refer to Redi Flo3 status box I O for proper connections To...

Страница 14: ...shaft end with a vegetable based grease 3 Screw the pump end on the motor A spanner may be used on the clamping faces of the pump part see fig 12 4 Install cable guard as described on page 7 When pump...

Страница 15: ...is larger than anticipated capacity b The valve s in the discharge pipe are partly closed blocked c The discharge pipe is partly chocked by impurities Iron bacteria d The non return valve of the pump...

Страница 16: ...e the valve oked Pull out the pump Check and clean or replace the pump if necessary Clean the pipes Repair replace the pump Check and repair the piping Replace Check the electricity supply Increase th...

Страница 17: ...sed in the product please deliver the product or any hazardous materials from it to your nearest GRUNDFOS company or service center Insulation Test Resistance Test High voltage Test Measure the voltag...

Страница 18: ...15SQE NE 1 1 4 NPT 22 30SQE NE 1 1 2 NPT STORAGE CONDITIONS Minimum Ambient Temperature 4 F Maximum Ambient Temperature 140 F Freeze Protection If the pump has to be stored after use it must be store...

Страница 19: ...7 6 10SQE10C 260 NE 1 C 230V 7 6 10SQE10C 300 NE 1 C 230V 7 6 10SQE15C 340 NE 1 1 2 C 230V 11 1 15SQE03A 70 NE 1 3 A 230V 115V 3 9 7 8 15SQE05A 110 NE 1 2 A 230V 115V 4 9 9 8 15SQE05B 130 NE 1 2 B 23...

Страница 20: ...s SPP1 Potentiometer 625468 RediFlo3 Motor Leads available in 5ft increments See price list 25ft 96037428 50ft 96037429 75ft 96037430 100ft 96037431 125ft 96037432 150ft 96037433 175ft 96037434 200ft...

Отзывы: