background image

                                                                            

                             

 

7

 

                                                               

 

 
Function/Principle 

 
When you activate Lubricus, Type D, the piston pump starts to work and pump the lubricant in small quantities to the outlets. 
The integrated microprocessor controls the function. Communication with the machine controller is necessary. Delivery rates 

and time between the lubrication intervals can be individually set by pulse signals. 
 
The Lubricus Lubrication System uses a four-pin socket to connect a M12X1 plug allowing communication with the machine 

controller.  An external 24 VDC power supply is used to switch ON and OFF (voltage of +20 ....up to +30 VDC, supplied to 
PIN 1). When voltage is supplied the lubrication pump is in operating condition. If there are no errors (Pump OK) the input 
voltage will be transferred to the output signal (PIN 4) indicating all is OK. Once the voltage supply to PIN 1 is stopped 

(switched OFF), the pump rests and saves the current operating conditions in memory. When the pump is turned back on the 
saved operating conditions will be continued. PIN 4 relays the operating condition. 

 
 
 

 

Connector PIN assignment, connection to Lubicus, Type D 
 

 

 
 

 

 
 
 

Output signal: in case of empty lubricant reservoir

: PIN 4 generates an alternating high and low signal, switching with  

0,5 Hz. 
 

Pump function control: 

after receiving a correct pulse signal at PIN 2, the pump starts to work. During the function of the 

pump (about 7s) the output signal at PIN 4 is switching from High (+ 20...30 VDC) to Low (0 V). By counting the signals of 
the pump function control there is a possibility to estimate the delivered quantity of lubricant and the remaining quantity in the 
lubricant reservoir (delivery rate per pulse signal =0,15 cm

³

).

 

 

 

 
 
 

 
 

 

Connector PIN assignment M 12 x 1 

 

PIN 1:   input v20...30 VDC, color brown 
 

PIN 2:   activation of the individual pump outlets. color white 
 
PIN 3:   Ground (GND), color blue 

 
PIN 4:   Output Signal, color black 

 
Details: 
 

Peak current Imax (during pump operation) approx. 350 mA, 
typically < 200 mA, Standby current (standby mode) < 20 mA 
 

Output signal PIN 4: High (+20…30 VDC) = OK                              

Low = 0 V = Error (empty signal, over current) 

 
The outlet signal, PIN4, can be charged with maximal 
300mA.Warning: the exit is not short-circuit proof 

 

A time delay fuse

 1A is normally required.

 

 

Содержание Lubricus LUB-D1

Страница 1: ...version 04 2013 User Guide Lubricus Lubrication System LUB D1 LUB D2 LUB D3 LUB D4 24 VDC...

Страница 2: ...4 General safety information 4 Transport and storage 6 Function Principle 7 Communication Interface Connector PIN assignment 7 Installation instruction Pulse signals details 8 Functional problems err...

Страница 3: ...ning Lubricus Lubrication System is designed for use in normal industrial environment indoor as well as outdoor but is not suitable for mounting on moving equipment for example trucks Only use origina...

Страница 4: ...on System Other uses or uses beyond those described above cannot be considered to be in accordance with the regulations Extent of warranty Warranties concerning operating safety reliability and capaci...

Страница 5: ...be protected from touching The protection on moving or rotating parts must not be removed In case of leakages of dangerous media proper disposal not endangering environment and people must be ensured...

Страница 6: ...oads Store the Lubricus Lubrication System in a cool and dry place to avoid corrosion of the system s individual parts Pay attention to the current safety and accident prevention instructions during t...

Страница 7: ...inued PIN 4 relays the operating condition Connector PIN assignment connection to Lubicus Type D Output signal in case of empty lubricant reservoir PIN 4 generates an alternating high and low signal s...

Страница 8: ...UB C 4 LUB C 1 1 Activate 1 1 Activate 1 1 1 2 outlets will be served alternately and dispense equal quantities from both outlets Activate 2 1 Activate 2 1 2 2 outlets will be served alternately and d...

Страница 9: ...5cm 1 5cm outlet 2 2 10 x 0 15cm 1 5cm Modell LUB D 1 1 outlet 1 1 20 x 0 15 cm 3 0 cm outlet 1 2 closed outlet 2 1 20 x 0 15 cm 3 0 cm outlet 2 2 closed Functional problems Error messages faults The...

Страница 10: ...move it 4 Remove the empty cartridge 5 Remove protection from the new cartridge 6 Lubricate O Ring of the new cartridge slightly 7 Place the cartridge on the inlet 8 Place the pump upright on flat sur...

Страница 11: ...ight without lubricant ca 1120g Integrated Control micro processor controlled Pressure monitoring integrated electronic monitoring backpressure Level monitoring integrated reedcontact Connector M12 x...

Страница 12: ...en disposing lubricant the waste disposal instructions of the lubricant manufacturer must be observed Disposal of Lubricus Lubrication System observe the regional valid laws and regulations The empty...

Отзывы: