10
2-Layer Film Install
Revision date: 04.17.20
Ribbon Board
Baseboards and Ribbon Boards
ATTENTION:
Materials for baseboards and ribbon boards are
supplied by customer
.
INSTALL BASEBOARDS
ATTENTION:
If you want to install a baseboard
and
the curtain stabilizer bar
kit was purchased, consult instructions included with that kit for details. If you
do not want to install the optional baseboard as described below, continue
with the next page.
1. After flashing is prepared, attach baseboards to assembled frame. Use
a drill and 5/16" drill bit to drill through rafter tubes and baseboards.
Secure using 1/4" x 3-1/2" (FAH008B) or 1/4" x 4" (FAH009B) carriage
bolts and FALB01B nuts. Review diagram below.
INSTALL RIBBON BOARDS
1. After flashing is installed, attach ribbon boards to assembled frame. Use
a drill and 5/16" drill bit to drill through rafter tubes and ribbon board.
Secure using 1/4" x 3-1/2" (FAH008B) or 1/4" x 4-1/2" (FAH009B)
carriage bolts and FALB01B nuts. Review diagram below.
NOTE ABOUT SPLICING BASEBOARDS AND RIBBON BOARDS
Never attach two boards to same rafter. Instead, splice boards on
the
backside/inside between rafters
. This results in a stronger, more
dependable installation. Use a small piece of lumber that spans a few
inches on each side of the splice. Secure using customer-supplied nails or
wood screws. See diagram at the right.
Inside greenhouse.
Outside
greenhouse.
2. Continue with u-channel installation.
2. Continue by installing baseboards.
Ribbon Board
Baseboard
Sample Frame
Actual frame may differ in design.
Baseboard