background image

14

113463_64_65HBC   Revision date: 08.27.19

End Panel Installation

3

END PANEL INSTALLATION – continued

6.  With assistance, carefully lift panel into 

position and wrap material around rafter. 

Hold in position. If peak purlin is attached to 

end rafter, remove Tek screw and work end 

panel between peak purlin and rafter.  

8.  Take a CC6213 fabric clip and snap it to the 

backside of the end rafter. Continue adding 

clips until entire panel is secured to rafter. 

Space fabric clips every 36" along rafter.

9.  Test zipper operation. If panel is too tight, 

zippers will open, but will not close easily. 

Do not force zipper!

 Loosen panel as 

needed so zippers function properly, then 

continue.

10. Drive a Tek screw through each clip and 

into rafter. 

Position screws in a location 

that will not contact cover material. 

Tape over screw if needed to protect cover 

material.

11.  Carefully remove excess panel material 

if desired. Allow a few inches to remain 

beyond fabric clips in case panel needs 

tightened.

NOTE:

 Reinstall screw 

after

 end panel 

install is complete.

7.  Continue pulling panel into position until 

entire panel is wrapped over rafter. 

Do not 

pull too tight; doing so will stress the zipper.

12. Repeat steps to install remaining end panel.
13. Return to each end rafter and reattach peak 

purlin to rafter if it was loosened to install 

panel.

14. Continue with next procedure.

5.  Fold panel so it rests on top of conduit. 

Actual end panel design may differ.

Содержание 113463H

Страница 1: ...ved Reproduction is prohibited without permission GrowSpan Roll Up Low Pro Tunnel STK DIMENSIONS 113463H B C 20 W x 5 H x 24 L 113464H B C 20 W x 5 H x 36 L 113465H B C 20 W x 5 H x 48 L Actual buildi...

Страница 2: ...chor assembly is an integral part of the high tunnel construction Improper anchoring may cause tunnel instability Failing to anchor tunnel properly may void manufacturer s warranty and may cause serio...

Страница 3: ...concrete continue with next procedure 12 Install tighten and secure end panels 13 Install tighten and secure main cover 14 Read care and maintenance information 15 Complete and return all warranty in...

Страница 4: ...not allow cover to remain open for extended time Periodically unroll cover for cleaning and to allow it to dry Remove debris and objects that accumulate on cover Use tools that will not damage cover w...

Страница 5: ...dle Support Lock 115287 Stabilizer Bar FA4110 FA4115 Hook Loop Fasteners FA4110 FA4115 102856 End Clamp 102197 Aluminum U Channel 102548 Cross Connector FA4472B Tek Screw 103395 Spin Handle 103396 Uni...

Страница 6: ...of frame is measured from center to center of ground posts 2 After placing first corner stake string a line the frame width center to center of ground posts and drive second corner stake 3 String a l...

Страница 7: ...ring frame as described in the MUST READ document do not auger holes for ground posts Instead follow the steps to mark ground post locations and drive posts into the ground at those locations See info...

Страница 8: ...ts in place See diagram below All posts to be plumb before adding concrete Use mounting holes in posts and customer supplied fasteners and stakes to hold posts in place 3 Add concrete to anchor posts...

Страница 9: ...Tek screws Wrap screws and slices with duct tape Gather parts Rafter pipes LPT166ES1W20 LPT166PS1W20 166S0755 FA4472B Tek screws 100442 magnetic nut setter Duct tape STEP 1 Select rafter pipes to ass...

Страница 10: ...d or have an assistant hold until next rafter is added and connected with purlins 3 Set next rafter in place and secure using 5 16 bolts and nuts ATTENTION Only the two end rafters use 102856 end clam...

Страница 11: ...art section for additional information and pipe identification Purlin runs end to end down center at top of each rafter ATTENTION At this time do not install brackets that secure square peak purlin to...

Страница 12: ...f cover is shown rolled to peak Cover is installed later 2 Assemble end panel conduit using the 1 315 pipe noted above secure each pipe joint with Tek screw and tape over screw Slide conduit into pock...

Страница 13: ...of end panel Attach each end of conduit to ground post using Tek screws and QH1330 brackets 3 Measure between end rafter ground posts to determine final conduit length Cut assembled conduit to fit if...

Страница 14: ...as needed so zippers function properly then continue 10 Drive a Tek screw through each clip and into rafter Position screws in a location that will not contact cover material Tape over screw if neede...

Страница 15: ...alternative steps for installation On the outside of frame attach first baseboard ground post using two 2 5 16 carriage bolts and nuts Countersink bolt heads if carriage bolts are not used Continue a...

Страница 16: ...ION 115287 Gather parts 115287 curtain stabilizer bars GS0049 splice plate FA4472B Tek screws 100442 magnetic nut setter 5 Stabilizer Bar Ground Level Ground post installed 2 below grade Install bar a...

Страница 17: ...conduits one for each side See side profile diagrams in Quick Start section for details and pipe identification NOTE Secure each pipe splice with a Tek screw and wrap connection with duct tape to pro...

Страница 18: ...below for frame cover material Solid Black Silver Cover B Diagrams show attaching aluminum bar 110155 through cover and into peak purlin of frame Install Tek screws approximately 17 on center through...

Страница 19: ...ame after removing excess material Check cover length NOTE Once cover is wrapped around conduit conduit should rest on ground next to frame when length is correct See photo inset right 3 Unroll cover...

Страница 20: ...to 36 extension pipe using one 1 Tek screw 2 Slide 6 easy spin pipe 166P006 onto free end of 36 extension pipe 3 Attach universal joint to end of 36 extension pipe 4 Attach assembly to roll up cover...

Страница 21: ...n all remaining locations on frame 8 Beginning with one side roll cover down to stabilizer bar and lock cover into place 9 Verify cover is positioned as desired on frame HOOK LOOP LOCATION GUIDE END R...

Страница 22: ...rom rafter splice Positon B Approx 36 from top center of rafter Positions C Mid point between A B A C Top Center Ground Level 36 12 B B C A GROUND LEVEL X X X X X X X Length 48 GROUND LEVEL X X X X Le...

Страница 23: ...Repeat as cover rolls down tunnel frame End fasteners can be reached when cover is locked down Film is shown Actual cover may differ ATTENTION Never leave cover partially open Cover must be fully ope...

Страница 24: ...Guide GrowSpan Roll Up Low Pro Tunnel 20 Wide Frame ATTENTION Diagram shows optional baseboard installed below stabilizer bar If baseboard is not used install stabilizer bar at ground level Ground Le...

Страница 25: ...ER TO CENTER OF GROUND POSTS 2 0 EMBEDMENT 5 5 1 8 GROUND LEVEL TO STRUCTURE PEAK 2 5 1 4 GROUND LEVEL Customer Supplied Baseboard Optional Customer Supplied Baseboard Optional ATTENTION Diagram shows...

Страница 26: ...5 GROUND POST 102675 RAFTER LPT166ES1W20 RAFTER LPT166ES1W20 RAFTER LPT166PS1W20 RAFTER 166S0755 RAFTER 166S0755 ALUMINUM BAR 110155 IF APPLICABLE PURLIN BRACKET END 102856 MID 102548 PURLIN BRACKET E...

Страница 27: ...ar If baseboard is not used install stabilizer bar at ground level 4 0 RAFTER SPACING 24 0 CENTER TO CENTER OF GROUND POSTS 2 0 EMBEDMENT GROUND LEVEL SIDEWALL PURLIN SIDEWALL PURLIN ROLLUP CONDUIT 13...

Страница 28: ...ROUND LEVEL SIDEWALL PURLIN PEAK PURLIN STABILIZER BAR 131S075 5 131P0735 1 PEAK PURLIN 102897 4 S15P048 1 STABILIZER BAR 115287 3 SIDEWALL PURLIN ROLLUP CONDUIT CUSTOMER SUPPLIED BASEBOARD OPTIONAL A...

Страница 29: ...ar If baseboard is not used install stabilizer bar at ground level 4 0 RAFTER SPACING 48 0 CENTER TO CENTER OF GROUND POSTS 2 0 EMBEDMENT GROUND LEVEL SIDEWALL PURLIN PEAK PURLIN STABILIZER BAR 131S07...

Страница 30: ...4_65HBC Revision date 08 27 19 Connections VIEW 3 CONNECTION VIEW 6 VIEW 1 CONNECTION VIEW 2 VIEW 5 CONNECTION VIEW 9 CONNECTION VIEW 8 CONNECTION VIEW 7 VIEW 4 CONNECTION ATTENTION Optional baseboard...

Страница 31: ...vision date 08 27 19 113463_64_65HBC Frame Connection Details install through side of tube install through side of pipe VIEW 3 VIEW 2 VIEW 1 VIEW 4 VIEW 6 VIEW 7 NOTE VIEW 8 VIEW 5 5 VIEW 9 Center of...

Страница 32: ...PLODED VIEW 2X 12 X 1 TEK SCREW EVERY 17 ALUMINUM BAR 110155 BLACKOUT MATERIAL PURLIN 1 5 SQ BLACKOUT MATERIAL CONNECTION PEAK IF APPLICABLE CLEAR FILM CONNECTION PEAK IF APPLICABLE NOTE BLACKOUT COVE...

Страница 33: ...ce Photo above shows frame with film cover Cross connectors secure side purlin to rafters Stabilizer bar is shown secured to outside of frame and runs near ground level the full length of the frame Th...

Отзывы: