GrowSpan 106363 Скачать руководство пользователя страница 2

GROWSPAN

  COLD FRAMES & GREENHOUSES

2

Revision date: 05.08.18

YOU MUST READ THIS DOCUMENT BEFORE YOU  

BEGIN TO ASSEMBLE THE SHELTER

.

Thank you for purchasing this Commercial cold frame. 

When properly assembled and maintained, this product will 

provide years of reliable service. These instructions include 

helpful hints and important information needed to safely 

assemble and properly maintain the cold frame. Please 

read these instructions 

before

 you begin.

If you have any questions during the assembly, contact 

Customer Service at 1-800-245-9881 for assistance.

SAFETY PRECAUTIONS

•  Wear eye protection.
•  Wear gloves when handling panels and frame parts.
•  Use a portable GFCI when working with power tools 

and cords.

•  Do not climb on the cold frame during or after 

construction.

•  Provide adequate ventilation if the structure is 

enclosed.

•  Do not store hazardous materials in the cold frame. 

ANCHORING INSTRUCTIONS

Prior to assembling this cold frame, please read the 

MUST 

READ

 document included with the shipment. 

WARNING:

 Strong winds can cause the cold frame to 

shift if it is not adequately secured to the site.

 

The site on which the cold frame is constructed will 

determine the anchoring method that is required.

 

Consult a professional contractor to determine the best and 

safest way to anchor the frame. 

 

Contact your sales representative at 1-800-245-9881 for 

anchoring suggestions. 

WARNING:

 To prevent property damage and serious 

personal injury, the assembled cold frame must be 

anchored to the site.

LOCATION

Choosing the proper location is an important step before 

you begin to assemble the cold frame.  

The following suggestions and precautions will help you  

determine whether your selected location is the best  

location. 
•  This cold frame has a metal frame. 

Never erect the 

cold frame under power lines or near fuse boxes or 

sources of electricity

.

•  Identify whether underground cables and pipes are  

present 

before

 preparing the site or anchoring the    

cold frame.

•  Location should be away from structures that could  

cause snow to drift on or around the cold frame.

•  Do not position the cold frame in a place where large 

loads such as snow and ice, large tree branches, or 

other overhead obstacles could fall. 

SITE

After choosing a location, proper preparation of the site is 

essential. The following site characteristics will help ensure 

the integrity of the cold frame.
• 

For best results,

 the site must be level to properly and 

safely erect and anchor the cold frame.

•  Drainage: Water draining off the cold frame and from  

areas surrounding the site should drain away from the  

site to prevent damage to the site, the cold frame, and  

contents of the cold frame.

WARNING:

 The individuals assembling this cold frame 

are responsible for designing and furnishing all  

temporary bracing, shoring and support needed 

during the assembly process (if applicable). For safety 

reasons, those who are not familiar with recognized 

construction methods and techniques 

must seek the 

help of a qualified contractor.

Содержание 106363

Страница 1: ...S Revision date 05 08 18 GrowSpan Heavy Duty Commercial Cold Frame STK DIMENSIONS 106363 4 W x 23 H x 7 9 L Photo may show a different but similar model 2018 GrowSpan All Rights Reserved Reproduction...

Страница 2: ...revent property damage and serious personal injury the assembled cold frame must be anchored to the site LOCATION Choosing the proper location is an important step before you begin to assemble the col...

Страница 3: ...5 Assemble the frame components in the order they are presented in these instructions 6 Read the Safety and the Cold Frame Care and Maintenance information at the end of these instructions 7 Complete...

Страница 4: ...ing FA4472B Tek Screw 102921B FA4474B Tek Screws and Neo bonded washers QH1330 Angle Bracket 104548 End Cap Profile Doors Fans Vents 113236z096 Aluminum H Channel Profile NOTE Install center bolt chan...

Страница 5: ...not allow channel side out installation Use the diagrams on this page to install H channel with flat side facing out ATTENTION Use only 1 1 2 Tek screws to attach H channel to building frame Do not u...

Страница 6: ...and install sliding cover panels 5 Install safety straps and cover hardware GrowSpan Heavy Duty Commercial Cold Frame S15P012 S15P092 102923 A second 102923 is used for the cold frame cover QH1330 S1...

Страница 7: ...2 and the angle brackets QH1330 attach the sidewall corner tubes NOTE The 18 lengths are positioned to the back and the 12 lengths are positioned to the front S15P018 S15P012 S15P012 S15P018 HINT Atta...

Страница 8: ...Locate the four 4 angle iron corner ground stakes 105232 and the remaining frame assembly 102923 to use as a guide for driving the stakes NOTE If you are positioning the cold frame on a surface such a...

Страница 9: ...to the stakes if used set and center the remaining frame 102923 on top of the assembled cold frame NOTE The cross brace of the cover frame is slightly off center While standing in front of the cold f...

Страница 10: ...instructions and the photos in this section to properly account for the installation requirements of the profile 3 Install the profile on each panel NOTE A small piece of tape not included can be used...

Страница 11: ...ends beyond the edges of the cut panels Refer to the photos before cutting the panels and profile CUT AND ASSEMBLE THE POLYCARBONATE PANELS CONTINUED ATTENTION This profile 104548 is installed on all...

Страница 12: ...line shows the edge of the panel Vertical profile sections run between the horizontal lengths ASSEMBLE THE TWO 2 SLIDING PANELS FOR THE COVER Panel A and Panel B are assembled differently Consult the...

Страница 13: ...profile for the panel When installed correctly the profile will appear as shown below for Panel A Assemble Panel B The steps to install the profile on Panel B are slightly different from those of the...

Страница 14: ...the procedures up to this point were followed the cover frame has been attached to the main cold frame and the sliding panels are prepared IMPORTANT NOTE For this procedure the small square or opening...

Страница 15: ...ng the edge of the frame Cover Frame Back of Frame The profile installed above acts as guide tracks for the sliding cover panels Diagram may differ slightly from the actual frame White dashed line sho...

Страница 16: ...screws of the long sections of cover frame profile to allow the tape to expand and retry the doors NOTE When properly installed there will be a noticeable drag between the panels when they are slid op...

Страница 17: ...e and cover frame along the sides to prevent damage to plants on the inside of the frame 1 Raise the cover and lock it in the open position using the locking hole in the support arm as shown 4 Flip th...

Страница 18: ...st remain secured at all times using the support arm and wing nuts Wing nuts must be tight to lock the support arm in place WARNING DO NOT prop the cover open Serious injury may occur if the prop slip...

Страница 19: ...AME Remove debris and objects that can accumulate on the cold frame Use tools that will not damage the polycarbonate panels when removing debris and when trimming around the outside of the cold frame...

Страница 20: ...18 QUICK START GUIDE Commercial Cold Frame with Sliding Cover Panels ASSEMBLY NOTE Install Tek screws using a clutched drill driver running approximately 750 RPM while applying approximately 50 lbs of...

Страница 21: ...TTENTION Install all profile for Panel A with the flat side up as shown UV protected side of the polycarbonate panel is always installed toward the sun ATTENTION Cut all profile for this panel so that...

Страница 22: ...urface up UV protected side of the polycarbonate panel is always installed toward the sun ATTENTION Cut all profile for this panel so that it is installed as shown in these diagrams Edge of Panel Edge...

Страница 23: ...TOP FRONT AND RIGHT SIDE Dashed line shows the edge of Panel A under Panel B NOTE Position the H Channel between each long horizontal profile section Install with flat side out Use two 2 FA4474B Tek...

Страница 24: ...08 18 PANEL LOCATION DIAGRAM BACK AND REMAINING SIDE NOTE Position the H Channel between each long horizontal profile section Install with flat side out Use two 2 FA4474B Tek screws View shows the co...

Страница 25: ...DOING SO WILL MAKE THE FILM DIFFICULT IF NOT IMPOSSIBLE TO REMOVE DAMAGE TO PANELS MAY OCCUR IF STACKED IN DIRECT SUNLIGHT PROTECT STACKED PANELS FROM DIRECT SUNLIGHT ATTENTION Install all UV protect...

Страница 26: ...1 2 13 1 2 C D 45 1 2 Dimensions for Panel C are the same as Panel D ATTENTION Install all UV Protected surfaces to the outside of the cold frame See previous page to determine which panels to cut fro...

Страница 27: ...245 9881 for additional information or to purchase the opener Solar Powered Opener Not included Must be purchased separately Views show the installed opener from the outside of the cold frame Views sh...

Отзывы: