background image

GROWSPAN

 ECONOMY COLD FRAMES

2

Revision date: 01.01.16

YOU MUST READ THIS DOCUMENT BEFORE YOU  

BEGIN TO ASSEMBLE THE SHELTER

.

Thank you for purchasing this cold frame. When properly 

assembled and maintained, this product will provide years 

of reliable service. These instructions include helpful hints 

and important information needed to safely assemble 

and properly maintain the cold frame. Please read these 

instructions 

before

 you begin.

If you have any questions during the assembly, contact 

Customer Service for assistance. 

SAFETY PRECAUTIONS

•  Wear eye protection.
•  Wear head protection.
•  Wear gloves when handling metal parts.
•  Use a portable GFCI (Ground Fault Circuit Interrupter) 

when working with power tools and cords.

•  Do not climb on the frame during or after construction.
•  Do not occupy the structure during high winds,  

tornadoes, or hurricanes.

•  Provide adequate ventilation if the structure is  

enclosed.

•  Do not store hazardous materials in the structure.
•  Provide proper ingress and egress to prevent  

entrapment.

LOCATION

Choosing the proper location is an important step before 

you begin to assemble the structure.  

The following suggestions and precautions will help you  

determine whether your selected location is the best  

location. 
•  Never erect the structure under power lines.
•  Identify whether underground cables and pipes are  

present 

before

 preparing the site or anchoring the    

structure.

•  Location should be away from structures that could  

cause snow to drift on or around the building.

•  Do not position the structure where large loads such as 

snow and ice, large tree branches, or other overhead 

obstacles could fall. 

SITE

After choosing a location, proper preparation of the site is 

essential. Follow the information below.
• 

A level site is required

. The site must be level to  

properly and safely erect and anchor the structure.

•  Drainage: Water draining off the structure and from  

areas surrounding the site should drain away from the  

site to prevent damage to the site, the structure, and  

contents of the structure.

WARNING:

 The individuals assembling this structure 

are responsible for designing and furnishing all  

temporary bracing, shoring and support needed during 

the assembly process. For safety reasons, those who 

are not familiar with recognized construction methods 

and techniques must seek the help of a qualified  

contractor.

Содержание 105163F

Страница 1: ...105165F 8 W x 7 H x 20 L 105166F 8 W x 7 H x 25 L 105167F 8 W x 7 H x 30 L Photo may show a different but similar model Frame is shown with optional cover GrowSpan Economy Cold Frames 2016 GrowSpan A...

Страница 2: ...step before you begin to assemble the structure The following suggestions and precautions will help you determine whether your selected location is the best location Never erect the structure under p...

Страница 3: ...wing definitions before you begin to assemble your shelter Conduit An assembly of pipes used to secure the main cover and end panels if equipped Purlins and some strut assemblies also consist of conne...

Страница 4: ...tions describe installing a baseboard recommended at ground level along each side of the frame The baseboard runs from the front to the back of the frame on the outside of the ground posts This basebo...

Страница 5: ...and photos will help you identify the different parts and show you how they are used Not all parts are shown FA4482B Tek Screw Swaged Plain Swaged and Plain Rafter Sections not all pieces are shown 10...

Страница 6: ...me For details of each assembly procedure consult the individual sections of these instructions See illustration below to identify main parts of the cold frame 1 Locate the required parts for each ass...

Страница 7: ...at least as long as the building from the first stake at 90 NOTE A transit can be used to ensure an accurate 90 angle or the 3 4 5 rule can be used Refer to diagram Using multiples of 3 4 5 such as 6...

Страница 8: ...int and the rafter positioned on a flat surface secure each joint using a single self tapping Tek screw Position Tek screws approximately 1 from pipe joint ATTENTION Install the screws so they will no...

Страница 9: ...k here FRAME ASSEMBLY Gather the parts All rafter assemblies 1 05 purlin pipes Tek screws FA4482B Lifts ladders and assistants as needed Frame Assembly Procedure 1 Using the proper lifts and with assi...

Страница 10: ...n using a Tek screw 10 Choose another rafter assembly and set it in position 11 Secure the rafter legs to the ground posts as previously described 12 Repeat the above steps as needed to stand place an...

Страница 11: ...cold frame construction Improper anchoring may cause instability and failure of the structure to perform as designed Failing to anchor the shelter properly will void the manufacturer s warranty and m...

Страница 12: ...ch a section of the poly latch U channel 102179 to the top of the first end rafter Begin at the top of the baseboard as shown below 2 Continue to attach the U channel sections working up and over the...

Страница 13: ...ecure the cover ATTENTION Center the main cover front to back and side to side to ensure that enough cover material is present to lock into the U channel If used the rope can remain in place to tempor...

Страница 14: ...ss accumulation Use tools that will not damage the cover when removing snow Check the contents of the shelter to verify that nothing is touching the cover that could cause damage If the cold frame is...

Страница 15: ...15 GROWSPAN ECONOMY COLD FRAMES Revision date 01 01 16 105164F 8 x 15 105165F 8 x 20 105167F 8 x 30 105166F 8 x 25 105163F 8 x 10 8 Wide Cold Frames...

Страница 16: ...GROWSPAN ECONOMY COLD FRAMES 16 Revision date 01 01 16 105164FF 8 x 15 105165FF 8 x 20 105167FF 8 x 30 105166FF 8 x 25 105163FF 8 x 10 8 Wide Cold Frames with covers FF skus only...

Страница 17: ...17 GROWSPAN ECONOMY COLD FRAMES Revision date 01 01 16 This page is reserved for customer notes...

Отзывы: