3.  Carefully position the 

first interior rafter

 in place and 

secure the leg pipes to the ground posts as previously 

described. 

 

NOTE:

 Position the Tek screws on the inside of the 

ground post so they do not interfere with the installation 

of the cover (if equipped).

4.  Select another interior rafter and secure it in the next 

set of ground posts.

5.  After setting the third rafter in place, slide one section 

of the purlin pipe into the pipe strap at the end rafter.

FRAME ASSEMBLY (CONTINUED)

6.  Select one of the cross-connectors and position it at 

the top of the mid (or second) rafter.

7.  Slide the purlin pipe and position the plain end of the 

purlin flush with (or slightly to the inside) of the end 

rafter and secure the purlin in the clamp with a Tek 

screw.  

Tek 

screw

NOTE:

 To prevent damage to the cover, do not allow 

the purlin to extend beyond the end rafter.

8.  Move to the second rafter and verify that the rafter 

spacing is 5' on-center. 

 

NOTE:

 Verify that the rafter is plumb front-to-back and 

side-to-side.

9.  Tighten the bolts in the cross connector and secure the 

cross connector to the purlin using a Tek screw.

10. Choose another rafter assembly and set it in position.
11.  Secure the rafter legs to the ground posts as previously 

described.

12. Repeat the above steps as needed to stand, place, 

and secure the remaining rafters to complete the frame 

assembly. 

 

NOTE:

 If the last end rafter is plumb and the purlin 

extends beyond the end of the rafter, cut the last 

section of purlin pipe to the required length. 

 

DO NOT allow the purlin to extend beyond the end 

rafter.

13. After the center purlin is in place, verify that each splice 

in the purlin is secured with a Tek screw to prevent it 

from separating. 

 

ATTENTION: 

To install a cover, read the following 

information and continue as needed with the next 

procedure. If your building includes a film cover and 

you have also purchased optional end frame kits and 

panels, read all instructions 

before you install the main 

cover film

. Many end frame kits require installation 

before a main cover is attached to the main building 

frame.  

 

Installing the main cover film before you install the 

end frame and end panel may require the partial 

removal of the cover film to first install the end 

frames and panels. 

14. If no cover is to be installed, the frame assembly 

is complete. Read the 

Care and Maintenance

 

information that follows. 

Rafter

Purlin

NOTE:

 Photo 

shows a similar 

frame with the 

same connection.

Содержание 105163F

Страница 1: ...105165F 8 W x 7 H x 20 L 105166F 8 W x 7 H x 25 L 105167F 8 W x 7 H x 30 L Photo may show a different but similar model Frame is shown with optional cover GrowSpan Economy Cold Frames 2016 GrowSpan A...

Страница 2: ...step before you begin to assemble the structure The following suggestions and precautions will help you determine whether your selected location is the best location Never erect the structure under p...

Страница 3: ...wing definitions before you begin to assemble your shelter Conduit An assembly of pipes used to secure the main cover and end panels if equipped Purlins and some strut assemblies also consist of conne...

Страница 4: ...tions describe installing a baseboard recommended at ground level along each side of the frame The baseboard runs from the front to the back of the frame on the outside of the ground posts This basebo...

Страница 5: ...and photos will help you identify the different parts and show you how they are used Not all parts are shown FA4482B Tek Screw Swaged Plain Swaged and Plain Rafter Sections not all pieces are shown 10...

Страница 6: ...me For details of each assembly procedure consult the individual sections of these instructions See illustration below to identify main parts of the cold frame 1 Locate the required parts for each ass...

Страница 7: ...at least as long as the building from the first stake at 90 NOTE A transit can be used to ensure an accurate 90 angle or the 3 4 5 rule can be used Refer to diagram Using multiples of 3 4 5 such as 6...

Страница 8: ...int and the rafter positioned on a flat surface secure each joint using a single self tapping Tek screw Position Tek screws approximately 1 from pipe joint ATTENTION Install the screws so they will no...

Страница 9: ...k here FRAME ASSEMBLY Gather the parts All rafter assemblies 1 05 purlin pipes Tek screws FA4482B Lifts ladders and assistants as needed Frame Assembly Procedure 1 Using the proper lifts and with assi...

Страница 10: ...n using a Tek screw 10 Choose another rafter assembly and set it in position 11 Secure the rafter legs to the ground posts as previously described 12 Repeat the above steps as needed to stand place an...

Страница 11: ...cold frame construction Improper anchoring may cause instability and failure of the structure to perform as designed Failing to anchor the shelter properly will void the manufacturer s warranty and m...

Страница 12: ...ch a section of the poly latch U channel 102179 to the top of the first end rafter Begin at the top of the baseboard as shown below 2 Continue to attach the U channel sections working up and over the...

Страница 13: ...ecure the cover ATTENTION Center the main cover front to back and side to side to ensure that enough cover material is present to lock into the U channel If used the rope can remain in place to tempor...

Страница 14: ...ss accumulation Use tools that will not damage the cover when removing snow Check the contents of the shelter to verify that nothing is touching the cover that could cause damage If the cold frame is...

Страница 15: ...15 GROWSPAN ECONOMY COLD FRAMES Revision date 01 01 16 105164F 8 x 15 105165F 8 x 20 105167F 8 x 30 105166F 8 x 25 105163F 8 x 10 8 Wide Cold Frames...

Страница 16: ...GROWSPAN ECONOMY COLD FRAMES 16 Revision date 01 01 16 105164FF 8 x 15 105165FF 8 x 20 105167FF 8 x 30 105166FF 8 x 25 105163FF 8 x 10 8 Wide Cold Frames with covers FF skus only...

Страница 17: ...17 GROWSPAN ECONOMY COLD FRAMES Revision date 01 01 16 This page is reserved for customer notes...

Отзывы: