background image

11

GROWSPAN

 STRAIGHT SIDED COLD FRAMES

Revision date: 01.01.16

FINISH ROUGH EDGES

Gather the parts:
•  Duct tape (supplied by customer)
•  Metal file
1.  Check for any sharp edges on the frame and file them 

smooth so they will not cut the cover.

2.  Apply two layers of heavy duct tape on all pipe  

connections and clamps that may contact the cover.

OPTIONAL COVER INSTALLATION 

(Cover is not included 

with standard cold frame.  Additional purchase is required if 

installing a cover and/or roll-up side accessory.)

 

 

The following sections describe the installation of a film 

cover. The cover shown in the following diagrams may 

differ from the actual cover. It is shown to illustrate a basic 

cover installation.

Additional parts and supplies must be purchased to 

complete the cover installation. 

These are not included with 

the basic cold frame components.

 

Contact Customer Service if you want to purchase a cover 

for your cold frame and to determine which cover and 

additional components are best suited for the application. 

3.  Attach the remaining end of the strut to the baseboard 

using a wood screw or nut and bolt (not included). See 

the diagram that follows for location. 

 

NOTE:

 A baseboard provides a place to attach each 

strut and helps keep the ground posts at the required 

depth. The customer is responsible for providing a 

baseboard for this frame.

4.  Repeat the above steps to attach the remaining side 

struts to the shelter.

5.  After securing the struts, verify that all clamps are 

secured with a Tek screw to the rafters.

6.  Continue the next procedure to anchor the assembled 

frame.

ANCHOR THE ASSEMBLED FRAME

At this point, anchor the greenhouse frame. Consult the 

MUST READ document for anchoring information and 

suggestions. Please call customer service at 1-800-245-

9881 for additional anchoring information.

CAUTION

: The anchor assembly is an integral part of 

the greenhouse construction. Improper anchoring may 

cause instability and failure of the structure to perform 

as designed. Failing to anchor the shelter properly 

will void the manufacturer’s warranty and may cause 

serious injury and damage.

SIDE STRUT INSTALLATION (CONTINUED)

Photo shows the strut attached 

to the inside of the customer- 

supplied baseboard.

Attach strut 

as shown.

End 

Rafter

Ground Level

Baseboard

Содержание 105044

Страница 1: ...16 STK DIMENSIONS 105044 28 W x 11 H x 36 L 105045 28 W x 11 H x 60 L 105046 28 W x 11 H x 72 L GrowSpan Straight Sided Cold Frames Photo may show a different but similar model 2016 GrowSpan All Righ...

Страница 2: ...mportant step before you begin to assemble the structure The following suggestions and precautions will help you determine whether your selected location is the best location Never erect the structure...

Страница 3: ...following definitions before you begin to assemble your shelter Conduit An assembly of pipes used to secure the main cover and end panels if equipped Purlins and some strut assemblies also consist of...

Страница 4: ...easily inventory the parts Refer to the Bill of Materials Spec Sheets 2 Verify that all parts listed on the Bill of Materials Spec Sheets are present If anything is missing or you have questions cons...

Страница 5: ...d photos will help you identify the different parts and show you how they are used Some parts are not shown 102676 Ground Post FA4482B Tek Screw Swaged Plain Swaged and Plain Rafter Sections 102547 Cr...

Страница 6: ...OVERVIEW This section is an overview of the process for assembling your cold frame For details please see section Assembling the Cold Frame Components See illustration below to identify main parts of...

Страница 7: ...d posts must be equal for the building to be square 7 Check all dimensions and adjust if needed before driving the remaining posts to the required height 8 After all four corner posts are accurately i...

Страница 8: ...N Do not secure the drilled pipes until the rafter is attached to the ground posts This allows holes in the drilled pipes to be aligned with those in the ground posts Install the screws so they will n...

Страница 9: ...for the shelter and tighten the connectors NOTE Each purlin assembly consists of 1 315 x 75 131S075 swaged pipes and one 1 1 315 x 73 5 131P0735 plain pipe 9 Continue adding rafters and purlin pipe un...

Страница 10: ...eated or recycled plastic lumber works well for a baseboard The baseboard when installed properly helps prevent the ground posts from working into the ground Depending on the building it also provides...

Страница 11: ...end of the strut to the baseboard using a wood screw or nut and bolt not included See the diagram that follows for location NOTE A baseboard provides a place to attach each strut and helps keep the g...

Страница 12: ...is procedure and continue with the OPTIONAL MAIN COVER INSTALLATION WITH ROLL UP SIDES procedure 1 Using Tek screws cut and attach a section of the poly latch U channel 102179 to each leg of an end ra...

Страница 13: ...to the U channel to secure the cover ATTENTION Center the main cover front to back and side to side to ensure that enough cover material is present to lock into the U channel If used the rope can rema...

Страница 14: ...ight depends on the roll up assembly NOTE Attach U channel to baseboard or to the ground posts if no roll up sides are desired 2 Attach the poly latch U channel flush with the ends of the ribbon board...

Страница 15: ...the cover at evenly spaced intervals and tie rope to the cover The length of the cover determines the number of holes that are needed to attach the ropes NOTE The ropes must be long enough to reach o...

Страница 16: ...to end and secured using the spring and U channel move to one side of the frame and repeat the steps to anchor the main cover to the first side Begin at one end of the U channel and work toward the o...

Страница 17: ...cover material if equipped to verify that it is in good repair Do not climb or stand on the cold frame at anytime Remove debris and objects that can accumulate on the cold frame Use tools that will no...

Страница 18: ...COLD FRAMES 18 Revision date 01 01 16 Grid Represents 12 Squares FRONT 48 Width Sidewall 28 0 10 11 5 8 Height Frame shown may vary in length from actual frame Ground Level QUICK START GUIDE 28 Wide S...

Страница 19: ...19 GROWSPAN STRAIGHT SIDED COLD FRAMES Revision date 01 01 16 FRONT PROFILE...

Страница 20: ...SPAN STRAIGHT SIDED COLD FRAMES 20 Revision date 01 01 16 SIDE PROFILE 105044 NOTE Baseboards supplied by customer 36 0 Length 72 Rafter Spacing 131S075 131S075 131S075 131P0735 Purlin run 131S075 131...

Страница 21: ...SIDED COLD FRAMES Revision date 01 01 16 SIDE PROFILE 105045 NOTE Baseboards supplied by customer 60 0 Length 72 Rafter Spacing Purlin run 131S075 131S075 131S075 131S075 131S075 131S075 131S075 131S...

Страница 22: ...GROWSPAN STRAIGHT SIDED COLD FRAMES 22 Revision date 01 01 16 SIDE PROFILE 105046 NOTE Baseboards supplied by customer 72 0 Length 72 Rafter Spacing Purlin run 131S075 11 131S0735 1...

Страница 23: ...IGHT SIDED COLD FRAMES Revision date 01 01 16 CONNECTIONS Strut Connection See View 2 Purlin Mid Rafter Connection See View 3 Purlin End Rafter Connection See View 1 NOTE Baseboards supplied by custom...

Страница 24: ...T SIDED COLD FRAMES 24 Revision date 01 01 16 CONNECTION DETAILS VIEW 1 PURLIN END RAFTER Rafter Band Clamp Strut VIEW 2 STRUT CONNECTION Rafter Purlin VIEW 3 PURLIN MID RAFTER Rafter Purlin End Clamp...

Страница 25: ...25 GROWSPAN STRAIGHT SIDED COLD FRAMES Revision date 01 01 16 Space below is reserved for customer notes...

Отзывы: