background image

GROWSPAN

 STRAIGHT SIDED COLD FRAMES

16

Revision date: 01.01.16

OPTIONAL MAIN COVER INSTALLATION W/ ROLL-UP 

SIDES (CONTINUED)

Photos show installing the spring into the U-channel on 

the outside of a frame. The process is the same for the 

U-channel attached to the top of the end rafters.

5.  Continue adding the spring into the U-channel at the 

top of the first end rafter. Ensure that an even amount 

of the cover is exposed and maintained along the edge 

of the frame as it is attached. 

 

NOTE:

 The cover material is cut longer/wider than is 

required to cover the frame. For easier anchoring, allow 

approximately 10" to extend past the edge of the end 

rafter as the cover is anchored in place.

6.  Continue down both edges of the first end rafter 

until the entire length of the end of the main cover is 

secured in place.

7.  Stretch the cover to the other end of the building and 

repeat the steps to secure the main cover in the U-

channel. 

 

NOTE:

 Pull the cover tight as the spring is inserted into 

the U-channel.

8.  After the cover is stretched end-to-end and secured 

using the spring and U-channel, move to one side of 

the frame and repeat the steps to anchor the main 

cover to the first side.  

 

Begin at one end of the U-channel and work toward the 

other. It is also possible to begin at the middle of each 

side and work toward each end. 

 

NOTE:

 Maintain an even length along the side. The 

final stretching of the cover takes place when the last 

side is secured.

9.  After securing the first side, move to the remaining side 

and secure it in place. 

 

IMPORTANT:

 

DO NOT REMOVE TOO MUCH OF THE 

EXCESS COVER MATERIAL AT EACH END.

 Some 

excess main cover material–the material that extends 

beyond the end rafters–should remain in place. If the 

main cover needs stretched in the future, remove the 

spring from the U-channel, grasp the excess material, 

pull the cover tight, and reinstall the spring. 

 

The excess material along the sides is rolled up in the 

roll-up side assembly.

10. Once the main cover is installed and secured in the  

U-channel, follow the instructions provided with the 

Twist-of-the-Wrist Assembly if used.

11.  Once you have completed the Twist-of-the-Wrist 

installation and install your Anti-Billow ropes, read the 

Care and Maintenance

 section that follows.

Roll-up Portion

of the Cover

Содержание 105044

Страница 1: ...16 STK DIMENSIONS 105044 28 W x 11 H x 36 L 105045 28 W x 11 H x 60 L 105046 28 W x 11 H x 72 L GrowSpan Straight Sided Cold Frames Photo may show a different but similar model 2016 GrowSpan All Righ...

Страница 2: ...mportant step before you begin to assemble the structure The following suggestions and precautions will help you determine whether your selected location is the best location Never erect the structure...

Страница 3: ...following definitions before you begin to assemble your shelter Conduit An assembly of pipes used to secure the main cover and end panels if equipped Purlins and some strut assemblies also consist of...

Страница 4: ...easily inventory the parts Refer to the Bill of Materials Spec Sheets 2 Verify that all parts listed on the Bill of Materials Spec Sheets are present If anything is missing or you have questions cons...

Страница 5: ...d photos will help you identify the different parts and show you how they are used Some parts are not shown 102676 Ground Post FA4482B Tek Screw Swaged Plain Swaged and Plain Rafter Sections 102547 Cr...

Страница 6: ...OVERVIEW This section is an overview of the process for assembling your cold frame For details please see section Assembling the Cold Frame Components See illustration below to identify main parts of...

Страница 7: ...d posts must be equal for the building to be square 7 Check all dimensions and adjust if needed before driving the remaining posts to the required height 8 After all four corner posts are accurately i...

Страница 8: ...N Do not secure the drilled pipes until the rafter is attached to the ground posts This allows holes in the drilled pipes to be aligned with those in the ground posts Install the screws so they will n...

Страница 9: ...for the shelter and tighten the connectors NOTE Each purlin assembly consists of 1 315 x 75 131S075 swaged pipes and one 1 1 315 x 73 5 131P0735 plain pipe 9 Continue adding rafters and purlin pipe un...

Страница 10: ...eated or recycled plastic lumber works well for a baseboard The baseboard when installed properly helps prevent the ground posts from working into the ground Depending on the building it also provides...

Страница 11: ...end of the strut to the baseboard using a wood screw or nut and bolt not included See the diagram that follows for location NOTE A baseboard provides a place to attach each strut and helps keep the g...

Страница 12: ...is procedure and continue with the OPTIONAL MAIN COVER INSTALLATION WITH ROLL UP SIDES procedure 1 Using Tek screws cut and attach a section of the poly latch U channel 102179 to each leg of an end ra...

Страница 13: ...to the U channel to secure the cover ATTENTION Center the main cover front to back and side to side to ensure that enough cover material is present to lock into the U channel If used the rope can rema...

Страница 14: ...ight depends on the roll up assembly NOTE Attach U channel to baseboard or to the ground posts if no roll up sides are desired 2 Attach the poly latch U channel flush with the ends of the ribbon board...

Страница 15: ...the cover at evenly spaced intervals and tie rope to the cover The length of the cover determines the number of holes that are needed to attach the ropes NOTE The ropes must be long enough to reach o...

Страница 16: ...to end and secured using the spring and U channel move to one side of the frame and repeat the steps to anchor the main cover to the first side Begin at one end of the U channel and work toward the o...

Страница 17: ...cover material if equipped to verify that it is in good repair Do not climb or stand on the cold frame at anytime Remove debris and objects that can accumulate on the cold frame Use tools that will no...

Страница 18: ...COLD FRAMES 18 Revision date 01 01 16 Grid Represents 12 Squares FRONT 48 Width Sidewall 28 0 10 11 5 8 Height Frame shown may vary in length from actual frame Ground Level QUICK START GUIDE 28 Wide S...

Страница 19: ...19 GROWSPAN STRAIGHT SIDED COLD FRAMES Revision date 01 01 16 FRONT PROFILE...

Страница 20: ...SPAN STRAIGHT SIDED COLD FRAMES 20 Revision date 01 01 16 SIDE PROFILE 105044 NOTE Baseboards supplied by customer 36 0 Length 72 Rafter Spacing 131S075 131S075 131S075 131P0735 Purlin run 131S075 131...

Страница 21: ...SIDED COLD FRAMES Revision date 01 01 16 SIDE PROFILE 105045 NOTE Baseboards supplied by customer 60 0 Length 72 Rafter Spacing Purlin run 131S075 131S075 131S075 131S075 131S075 131S075 131S075 131S...

Страница 22: ...GROWSPAN STRAIGHT SIDED COLD FRAMES 22 Revision date 01 01 16 SIDE PROFILE 105046 NOTE Baseboards supplied by customer 72 0 Length 72 Rafter Spacing Purlin run 131S075 11 131S0735 1...

Страница 23: ...IGHT SIDED COLD FRAMES Revision date 01 01 16 CONNECTIONS Strut Connection See View 2 Purlin Mid Rafter Connection See View 3 Purlin End Rafter Connection See View 1 NOTE Baseboards supplied by custom...

Страница 24: ...T SIDED COLD FRAMES 24 Revision date 01 01 16 CONNECTION DETAILS VIEW 1 PURLIN END RAFTER Rafter Band Clamp Strut VIEW 2 STRUT CONNECTION Rafter Purlin VIEW 3 PURLIN MID RAFTER Rafter Purlin End Clamp...

Страница 25: ...25 GROWSPAN STRAIGHT SIDED COLD FRAMES Revision date 01 01 16 Space below is reserved for customer notes...

Отзывы: