GROWSPAN

 STRAIGHT SIDED COLD FRAMES

Revision date: 01.01.16

3.  Repeat these steps for the remaining side.
4.  With the U-channel secured to the sides of the frame in 

the desired location, attach poly latch U-channel to the 

top of one end rafter using Tek screws. 

 

NOTE:

 The poly latch U-channel will bend with the 

curve of the rafter as it is attached.

5.  Repeat the steps to attach the U-channel to the top of 

the remaining end rafter and continue with the main 

cover installation.

OPTIONAL MAIN COVER INSTALLATION WITH ROLL-

UP SIDES (CONTINUED)

Install Main Cover with Roll-up Sides

Gather the parts:
•  Main cover
•  Ropes long enough to reach over the frame (provided 

by customer)

•  U-channel spring
•  Box cutter or utility knife 

Assembly Procedure

 

After the poly latch U-channel is attached to the frame, 

unpack the main cover and pull into place. Ropes or straps 

are typically used to pull the main cover onto and over the 

frame.

WARNING: 

To prevent damage to the cover and to 

prevent serious personal injury, DO NOT attempt to 

install the main cover on windy or stormy days.

1.  Unpack the main cover and position it at the base along 

one side of the frame.

2.  Make small holes along the edge of the cover at evenly 

spaced intervals and tie rope to the cover. (The length 

of the cover determines the number of holes that are 

needed to attach the ropes.) 

 

NOTE:

 The ropes must be long enough to reach over 

the top of the building to the other side. Long buildings 

will require additional ropes to prevent tearing the main 

cover when it is pulled into place.

3.  After tying the ropes to the main cover, throw the ropes 

over the top of the frame and pull the cover into place. 

Cover must be centered side-to-side and end-to-end. 

IMPORTANT:

 To prevent damage to the main cover 

during installation, additional personnel and lifts may be 

needed.

4.  Once the main cover is in place and centered on the 

frame, begin at the peak of one end rafter and install 

the wire spring into the U-channel to secure the cover. 

 

ATTENTION:

 Center the main cover front to back and 

side-to-side to ensure that enough cover material is 

present to lock into the U-channel. 

The excess cover 

along each side is rolled up when the roll-up side 

assemblies are installed.

 

 

The rope can remain in place to temporarily secure 

the cover if needed. Remove the ropes as the cover is 

secured to the frame. 

 

Diagram shows the ribbon board installed for a roll-up 

side panel. U-channel for your cold frame cover may be 

installed in a different location.

U-Channel

End Rafter

Ropes

Frame shown may vary in length from actual frame.

Содержание 105044

Страница 1: ...16 STK DIMENSIONS 105044 28 W x 11 H x 36 L 105045 28 W x 11 H x 60 L 105046 28 W x 11 H x 72 L GrowSpan Straight Sided Cold Frames Photo may show a different but similar model 2016 GrowSpan All Righ...

Страница 2: ...mportant step before you begin to assemble the structure The following suggestions and precautions will help you determine whether your selected location is the best location Never erect the structure...

Страница 3: ...following definitions before you begin to assemble your shelter Conduit An assembly of pipes used to secure the main cover and end panels if equipped Purlins and some strut assemblies also consist of...

Страница 4: ...easily inventory the parts Refer to the Bill of Materials Spec Sheets 2 Verify that all parts listed on the Bill of Materials Spec Sheets are present If anything is missing or you have questions cons...

Страница 5: ...d photos will help you identify the different parts and show you how they are used Some parts are not shown 102676 Ground Post FA4482B Tek Screw Swaged Plain Swaged and Plain Rafter Sections 102547 Cr...

Страница 6: ...OVERVIEW This section is an overview of the process for assembling your cold frame For details please see section Assembling the Cold Frame Components See illustration below to identify main parts of...

Страница 7: ...d posts must be equal for the building to be square 7 Check all dimensions and adjust if needed before driving the remaining posts to the required height 8 After all four corner posts are accurately i...

Страница 8: ...N Do not secure the drilled pipes until the rafter is attached to the ground posts This allows holes in the drilled pipes to be aligned with those in the ground posts Install the screws so they will n...

Страница 9: ...for the shelter and tighten the connectors NOTE Each purlin assembly consists of 1 315 x 75 131S075 swaged pipes and one 1 1 315 x 73 5 131P0735 plain pipe 9 Continue adding rafters and purlin pipe un...

Страница 10: ...eated or recycled plastic lumber works well for a baseboard The baseboard when installed properly helps prevent the ground posts from working into the ground Depending on the building it also provides...

Страница 11: ...end of the strut to the baseboard using a wood screw or nut and bolt not included See the diagram that follows for location NOTE A baseboard provides a place to attach each strut and helps keep the g...

Страница 12: ...is procedure and continue with the OPTIONAL MAIN COVER INSTALLATION WITH ROLL UP SIDES procedure 1 Using Tek screws cut and attach a section of the poly latch U channel 102179 to each leg of an end ra...

Страница 13: ...to the U channel to secure the cover ATTENTION Center the main cover front to back and side to side to ensure that enough cover material is present to lock into the U channel If used the rope can rema...

Страница 14: ...ight depends on the roll up assembly NOTE Attach U channel to baseboard or to the ground posts if no roll up sides are desired 2 Attach the poly latch U channel flush with the ends of the ribbon board...

Страница 15: ...the cover at evenly spaced intervals and tie rope to the cover The length of the cover determines the number of holes that are needed to attach the ropes NOTE The ropes must be long enough to reach o...

Страница 16: ...to end and secured using the spring and U channel move to one side of the frame and repeat the steps to anchor the main cover to the first side Begin at one end of the U channel and work toward the o...

Страница 17: ...cover material if equipped to verify that it is in good repair Do not climb or stand on the cold frame at anytime Remove debris and objects that can accumulate on the cold frame Use tools that will no...

Страница 18: ...COLD FRAMES 18 Revision date 01 01 16 Grid Represents 12 Squares FRONT 48 Width Sidewall 28 0 10 11 5 8 Height Frame shown may vary in length from actual frame Ground Level QUICK START GUIDE 28 Wide S...

Страница 19: ...19 GROWSPAN STRAIGHT SIDED COLD FRAMES Revision date 01 01 16 FRONT PROFILE...

Страница 20: ...SPAN STRAIGHT SIDED COLD FRAMES 20 Revision date 01 01 16 SIDE PROFILE 105044 NOTE Baseboards supplied by customer 36 0 Length 72 Rafter Spacing 131S075 131S075 131S075 131P0735 Purlin run 131S075 131...

Страница 21: ...SIDED COLD FRAMES Revision date 01 01 16 SIDE PROFILE 105045 NOTE Baseboards supplied by customer 60 0 Length 72 Rafter Spacing Purlin run 131S075 131S075 131S075 131S075 131S075 131S075 131S075 131S...

Страница 22: ...GROWSPAN STRAIGHT SIDED COLD FRAMES 22 Revision date 01 01 16 SIDE PROFILE 105046 NOTE Baseboards supplied by customer 72 0 Length 72 Rafter Spacing Purlin run 131S075 11 131S0735 1...

Страница 23: ...IGHT SIDED COLD FRAMES Revision date 01 01 16 CONNECTIONS Strut Connection See View 2 Purlin Mid Rafter Connection See View 3 Purlin End Rafter Connection See View 1 NOTE Baseboards supplied by custom...

Страница 24: ...T SIDED COLD FRAMES 24 Revision date 01 01 16 CONNECTION DETAILS VIEW 1 PURLIN END RAFTER Rafter Band Clamp Strut VIEW 2 STRUT CONNECTION Rafter Purlin VIEW 3 PURLIN MID RAFTER Rafter Purlin End Clamp...

Страница 25: ...25 GROWSPAN STRAIGHT SIDED COLD FRAMES Revision date 01 01 16 Space below is reserved for customer notes...

Отзывы: