¼" to ½"
¾" NPT (Brass Pipe)
Must use sealant tape.
Apply silicone around
the steam pipe to form
a watertight seal.
Head assembly
(Cover plate & hub)
Back
Plate
Apply Silicone to
the back edge of
the Back Plate
Wrap the threads
of the nipple with
pipe sealant tape.
Aroma
Well
120°
120°
Head assembly
(Cover plate & hub)
Center Hub
Aroma
Well
If repositioning is necessary remove
3 screws and rotate 120
If needed to improve bather comfort the included optional
steam deflector can be installed to block the flow of
steam from any of the shown sides of the steam head.
Head Assembly
Back View
Deflector Plate
6.
Place a bead of silicone around the back outer edge of
the back plate.
7.
Center and square the back plate over the nipple. While
holding it in place screw the head on to the nipple hand
tight.
8.
Adjust the back plate and head to line up squarely.
Remove any excess silicone with rubbing alcohol.
Installation Specifications
NOTE: The steam head has been designed with a 360 degree
dispersion of steam to improve circulation and to minimize the
hotspots created with the traditional steam heads. For maximum
comfort the steam head should always be located as far from the
seating area as possible. Should the location of the steam head
necessitate blocking the steam from a particular direction to improve
bather comfort, the supplied deflector plate can be added to any of
the three sides shown to help divert the steam away from the
bather. The deflector is attached to the back side of the head before
installation with 2 stainless steel screws provided.
1.
Make sure the 3/4” nipple protrudes beyond the tile ¼" to ½".
IMPORTANT: If the nipple protrudes beyond ½” the O-ring will not
make a proper seal and the nipple will have be adjusted.
2.
Wrap the threads of the nipple with pipe sealant tape.
3.
Make sure the head will line up in the upright position when
tightened. The head should only be firmly hand tight. Using a
wrench on the head may damage it. Screw the head on to the
nipple and see how it lines up. Once a proper alignment is made
remove the head.
NOTE: If necessary the head can be repositioned by disassembling
the hub from the cover and selecting one of the two alternate
positions as shown in figure 1.
4.
Re-apply sealant tape if necessary.
5.
Place a bead of silicone around the pipe, sealing the pipe to the
wall.
05/11
Pub. No. 149-B
3199 Steamhead Installation Instructions
Model: 3199
Figure 1
Figure 2
Figure 3 - Optional Deflector
®
East Coast Office: 25 E. Union Ave., East Rutherford, NJ 07073 • Tel: 800-577-6478 • Fax: 201-933-0746
West Coast Office: Tel: 800-355-6478 • Fax: 661-940-1617
®
Содержание F-DIGITAL DELUXE 36 371
Страница 3: ...II 36 418 36 397 26 374 ...
Страница 7: ...III 36 397 ...
Страница 9: ...I 1 ...
Страница 10: ...I 2 ...
Страница 11: ...I 3 2 1 ...
Страница 12: ...I 4 4 3 ...
Страница 18: ...III 24mm 10 11 12 2 3 1 13 2 3 5 4 1 ...
Страница 21: ...II 6 5 7 8 9 10 ...
Страница 25: ...II 1 2 6 3 5 2 5mm 1 2 12mm 4 ...
Страница 28: ...I 1 ...
Страница 29: ...3 2 ...
Страница 30: ...3 4 2 70 3 4 1 45 Ø6 1 4 3 max 3 16 max 5 max 3 16 max 5 9 16 Ø21 2 6 5 3 ...
Страница 31: ...I X 41 X 1 5 8 M28x1 5 X 24mm 8 4 7 9 10 ...
Страница 39: ...I 1 ...
Страница 40: ...1 2 12mm 32mm 12mm 27 251 12mm 12mm 27 252 12mm 1 2 3 4 5a 5b 5a 5b 2 ...
Страница 41: ...max 5 12mm 32mm Ø6 32mm 9 6a 6b 7 8 10 11 12 3 ...
Страница 42: ...1 2 3mm 13 2 5mm 15 16 17 14 4 ...
Страница 46: ...3 2 1 5 P 6 3 A 27m m 4 A ...
Страница 50: ...II II ...
Страница 51: ...Please pass these instructions on to the end user of the fitting Installation options 1 ...
Страница 52: ...Installation options 2 ...
Страница 58: ...II 2 6 5 7 8 4 3 ...
Страница 60: ...Design Quality Engineering GROHE Germany 99 882 031 ÄM 226188 10 12 Prod Nr 1 2 3 4 6 7 5 ...
Страница 61: ...Design Quality Engineering GROHE Germany ...
Страница 64: ...II 2 5 4 6 7 3 ...