![Groen TDHC Series Скачать руководство пользователя страница 6](http://html1.mh-extra.com/html/groen/tdhc-series/tdhc-series_operators-manual_2268422006.webp)
OM-TDH/C
5
The TDH/C is shipped from the factory strapped on a
pallet.
Inspection & Unpacking
WARNING
THIS UNIT MUST BE INSTALLED BY PERSONNEL WHO ARE QUALIFIED TO WORK WITH ELECTRICITY
AND PLUMBING. IMPROPER INSTALLATION CAN CAUSE INJURY TO PERSONNEL AND/OR DAMAGE
TO THE EQUIPMENT. THE UNIT MUST BE INSTALLED IN ACCORDANCE WITH APPLICABLE CODES.
The unit arrives completely assembled. The unit is
To remove the kettle from the box, cut any straps from
strapped on a skid and in a heavy carton. Inspect
around the box. Detach the box sides from the skid.
the carton carefully for damage. Open the container
Pull the box up off the unit, taking care to avoid
and check the unit for hidden damage. Report
damage or injury from any staples left in the box walls.
shipping damage or shipment errors to the delivery
When installation is to begin, cut the straps holding the
agent.
kettle on the skid, and lift the kettle straight up off the
CAUTION
SHIPPING STRAPS ARE UNDER TENSION
AND CAN SNAP BACK WHEN CUT. TAKE
CARE TO AVOID PERSONAL INJURY OR
DAMAGE TO THE UNIT BY STAPLES LEFT
IN THE WALLS OF THE CARTON.
Write down the model number, serial number, and
installation date for your unit at the top of the
Maintenance and Service Log on Page 21. Keep this
manual with the unit.
skid. Examine the packing materials to make sure no
loose parts are discarded with the materials.
CAUTION
UNIT WEIGHS FROM 215 LBS. (98 KG) TO 240
LBS. (109 KG). INSTALLER SHOULD OBTAIN
HELP AS NEEDED TO LIFT THIS WEIGHT
SAFELY.
When installation is to begin, carefully cut the straps
which hold the unit on the skid. Lift the unit straight
up off the skid. Examine packing materials to be sure
loose parts are not discarded with the materials.
Содержание TDHC Series
Страница 21: ...OM TDH C 20 Schematic...