background image

OM-CC-E and C/2-E

11

Examples: 2 minutes = 00:02 

(Just press 2).

1 hour and 30 minutes = 01:30

(Press 1, 3, and 0, or press 9,0

the timer will change to 1:30)

The colon [:] between the numbers on the time

display will blink and the generator will begin to

produce steam.  The time will not count down

unless the 

READY

 light is lit.

NOTE

: You cannot change modes if the timer is

running.

8.

To Test Combo Mode Operation

, turn on the

power and clear any time from the timer display. 

Press the 

COMBO

 touch pad.  Set the 

COOK

temperature to 300

o

F (150

o

C).  The 

WAIT

 light

will come on.  It will remain on while (1) the steam

generator fills with water and heats it to its

standby temperature and (2) the air heater raises

the air temperature to 300

o

F.  Both actions should

be completed in about five minutes, starting with a

cold unit.  When the set temperature is attained,

the

WAIT

 light will go off, and the 

READY

 light

will come on.

NOTE:

 The timer does not control the oven in

either the Combo or Oven Modes.

9.

To Test Oven Mode Operation

, turn on the

power and clear the Time/Status display.  Press

the

OVEN

 touch pad.   Set the cook temperature

to 350

o

F (175

o

C).  The 

WAIT

 light will come on. 

Within six minutes from a cold start, the 

WAIT

light should go out and the 

READY

 light should

come on.  When that happens, turn the 

COOK

temperature setting down to 320

o

F (160

o

C).  The

HOT

 light will come on. The heat-up times

provided above may vary slightly as a result of

voltage or water pressure differences. 

10. To shut down the unit, switch off the power.

11. If your Convection Combo™ behaves as

described, the unit is functioning correctly, and is

ready for use.

OM-CC-E and C/2-E

11

Содержание Convection Combo C/2-E

Страница 1: ...FC CC10 E OPERATOR MANUAL OM CC E and C 2 E Part Number 121085 DOMESTIC MODELS CC10 E 2 CC 0 E C 2 20 E 2 C 2 20E CONVECTION COMBO Combination Steamer Oven THIS MANUAL MUST BE RETAINED FOR FUTURE REFE...

Страница 2: ...E OUTSIDE OF THE OVEN DISCONNECT THE ELECTRIC POWER SUPPLY KEEP WATER AND CLEANING SOLUTIONS OUT OF CONTROLS AND ELECTRICAL COMPONENTS NEVER HOSE OR STEAM CLEAN ANY PART OF THE UNIT WARNING ALLOW COOK...

Страница 3: ...HOOTING 21 DIAGRAMS AND SCHEMATICS 23 SERVICE LOG 27 References UNDERWRITERS LABORATORIES INC 333 Pfingsten Road Northbrook Illinois 60062 KLENZADE SALES CENTER ECOLAB Inc 370 Wabasha St Paul Minnesot...

Страница 4: ...s are located on the right side of the front panel Standard controls let you to operate the Convection Combo in any one of three cooking modes 3 As a convection oven 4 As a self contained pressureless...

Страница 5: ...bout the minerals in your water The water going to the steam generator should have between 30 and 40 parts per million ppm total dissolved solids TDS and should have a pH acidity rating of 7 0 to 9 0...

Страница 6: ...tacked unit from the factory If the unit does not have a factory installed stand the installer must provide a table stand or counter which is strong enough to support the unit Use of casters is not re...

Страница 7: ...ction A double stacked unit should have separate protection for the upper and lower steamer ovens CURRENT DEMAND CC10 E MODELS Voltage Current Power 1 Phase 3 Ph per Line 208 44 7 A 27 5 A 9 3 KW 240...

Страница 8: ...m unit is conceptually shown below IMPORTANT Do not allow any water traps in the line A trap can cause pressure to build up inside the cavity during steaming which will make the door gasket leak 2 in...

Страница 9: ...OM CC E and C 2 E 9 Proper Drain Line Connections 2 in 50 mm OM CC E and C 2 E 9...

Страница 10: ...3 4000 1219 4 5000 1524 5 6000 1830 6 7000 2133 7 8000 2438 8 9000 2745 9 10000 3048 10 11000 3353 11 12000 3658 12 13000 3962 13 14000 4267 14 15000 4572 15 5 For C 2 20E only Check Fan Rotation IMPO...

Страница 11: ...F Both actions should be completed in about five minutes starting with a cold unit When the set temperature is attained the WAIT light will go off and the READY light will come on NOTE The timer does...

Страница 12: ...OM CC E and C 2 E 12 Standard Operating Controls OM CC E and C 2 E 12...

Страница 13: ...touch pad once stops the beeper and resets the timer to the time that was last set Pressing twice clears it to 00 00 At the end of a cooking period opening the door is the same as pressing CLEAR once...

Страница 14: ...121042 Probe Hold P N 121072 B Operating Instructions 1 Steamer Mode a If the unit is off switch on the electric power by pressing the ON touch pad If the SERVICE light comes on when you turn on the...

Страница 15: ...ng the cooking process steaming and the timer will stop but will not reset When you close the door steaming and timing will continue WARNING WHEN YOU OPEN THE DOOR STAY AWAY FROM ANY STEAM COMING OUT...

Страница 16: ...T lights will turn on The unit can be cooled quickly to the desired cooking temperature by leaving the door open or following the Fast Cool procedure described near the end of this section Paragraph 4...

Страница 17: ...the temperature selected the HOT and WAIT lights will turn on The unit can be cooled quickly by leaving the door open or following the Fast Cool procedure described near the end of this section Parag...

Страница 18: ...n be cooled quickly by opening the door and pressing START The fan will operate and the Time Status display will show the word COOL This is the only time the fan operates with the door open WARNING DO...

Страница 19: ...t spray hot glass with water or chemicals This could cause the glass to break from thermal shock e Use mild soap without abrasives and warm water to clean the door gasket DO NOT use caustic oven clean...

Страница 20: ...up degreaser to generator or lightly coat generator area and elements with spray degreaser Put generator cover and right side panel back into position 4 Close door and press START The Time Status disp...

Страница 21: ...Loosen the lock nut at the base of the latch pin and turn the latch pin turn clockwise Re tighten the lock nut b After adjustment run the unit to test for further steam leaks c If there is still leaka...

Страница 22: ...unit will operate in Steamer and Clean Cycle Modes only Call your Groen Service Agency 6 Faulty generator probe The unit will operate in Oven Mode only Call your Groen Service Agency 7 Time Between F...

Страница 23: ...OM CC E and C 2 E 23 CC10 E Heater Schematic CC10 E Control Schematic Diagrams Schematics OM CC E and C 2 E 23...

Страница 24: ...OM CC E and C 2 E 24 C 2 20E Control Schematic 208 240 Volts C 2 20E Control Schematic 480 Volts Diagrams Schematics Continued OM CC E and C 2 E 24...

Страница 25: ...OM CC E and C 2 E 25 C 2 20E Heater Schematic 208 240 Volts C 2 20E Heater Schematic 480 Volts Diagrams Schematics Continued OM CC E and C 2 E 25...

Страница 26: ...OM CC E and C 2 E 26 C 2 20E Heater Schematic 208 240 Volts Units That Meet Canadian Standards Association Requirements Diagrams Schematics Continued OM CC E and C 2 E 26...

Отзывы: