OM-CC-E and C/2-E
6
Installation and Start-Up
WARNING
THE UNIT MUST BE INSTALLED BY PERSONNEL WHO ARE QUALIFIED TO WORK WITH ELECTRICITY
AND PLUMBING. IMPROPER INSTALLATION CAN CAUSE INJURY TO PERSONNEL AND/OR DAMAGE TO
THE EQUIPMENT. THE UNIT MUST BE INSTALLED IN ACCORDANCE WITH APPLICABLE CODES.
CAUTION
DO NOT INSTALL THE UNIT WITH THE RIGHT SIDE VENTS BLOCKED OR WITHIN 12 INCHES OF A HEAT
SOURCE (SUCH AS A BRAISING PAN, DEEP FRYER, CHAR BROILER OR KETTLE). DO NOT INSTALL TO
THE LEFT OF ANY OPEN-FLAME EQUIPMENT.
DO NOT INSTALL WITHIN FOUR FEET OF A STEAM DRAIN.
TO AVOID DRAINAGE PROBLEMS, LEVEL THE UNIT FRONT TO BACK.
INSTALLATION MUST BE IN ACCORDANCE WITH ALL APPLICABLE CODES.
1. Mounting
Minimum rear clearance is 6" from back wall.
If you wish to install a Convection Combo™ on
top of another, you should obtain a double
stacked unit from the factory.
If the unit does not have a factory-installed stand,
the installer must provide a table, stand or counter
which is strong enough to support the unit. Use
of casters is
not
recommended.
To avoid drainage problems, level the unit front to
rear, or provide a slight pitch to the rear.
Bolt the unit to the table, stand or counter top,
using the mounting holes in its base.
2. Electrical Supply Connections
b.
Panel Removal
The right side panel must be removed to gain
access to the wiring and control
compartment. Remove the two screws at the
bottom of the panel. Slide the panel toward
the front of the unit, lift it and set it aside.
c.
Supply Voltage
CC10-E and C/2-20E models must operate at
the rated nameplate voltage, plus or minus
10%.
d.
Terminal block
The terminal block for incoming power is
located at the back of the control
compartment.
WARNING
WHEN CONNECTING FOR SINGLE PHASE
OPERATION, DO NOT CONNECT ANY WIRE TO
LINE 3 (THE TERMINAL FARTHEST LEFT). THIS
WILL CAUSE A SHORT CIRCUIT.
OM-CC-E and C/2-E
6
Содержание Convection Combo C/2-E
Страница 9: ...OM CC E and C 2 E 9 Proper Drain Line Connections 2 in 50 mm OM CC E and C 2 E 9...
Страница 12: ...OM CC E and C 2 E 12 Standard Operating Controls OM CC E and C 2 E 12...
Страница 23: ...OM CC E and C 2 E 23 CC10 E Heater Schematic CC10 E Control Schematic Diagrams Schematics OM CC E and C 2 E 23...