OM-CC-G and C/2-G
21
Top — The top partition is flat and has no holes.
Remove it by pushing upward, then pushing from
left to right to disengage the four hooks to their
support posts.
STEP 2, Continued
Apply cleaner to the oven walls and heat
exchange tubes. Apply it also to the rear of each
removable partition.
Return the four partitions to their proper locations
in the following order:
Top — The top partition is flat and has no
holes. Install it by pushing upward, then
pushing from right to left to engage the four
hooks to their support posts.
Bottom — The bottom partition has a small
circular pattern of drain holes. Place it
directly down onto the four support posts.
Right — The right partition includes a large,
circular, flared opening that must be
centered in front of the fan. Push downward
to engage the four hooks to their support
posts.
If absolutely necessary
, you may
remove the wire rack support.
Left — The left partition includes a back
plate and an air distribution baffle. Push
down to engage the four hooks to their
support posts.
If absolutely necessary
,
you may disassemble the back plate, baffle
and wire rack support.
FOR CAVITY CLEANING ONLY,
GO TO STEP 4.
WARNING
DO NOT OPERATE THE UNIT IN ANY MODE
UNLESS ALL FOUR REMOVABLE PARTITIONS
HAVE BEEN RETURNED TO THEIR PROPER
LOCATIONS.
STEP 3 (Deliming Only)
Water hardness affects the de-limer’s
performance. In very hard water, stronger
solutions and more frequent applications of
de-limer may be necessary. (Refer to Water
Quality and Treatment on Page 6).
The deliming port is located directly below the
control panel.
De-limer is poured through the port into the
delimer reservoir.
Cooking Chamber with Partitions Removed
Cooking Chamber with Partitions in Place
Содержание C/2-20G
Страница 10: ...OM CC G and C 2 G 10 Proper Drain Line Connections ...
Страница 14: ...OM CC G and C 2 G 14 Standard Operating Controls ...
Страница 25: ...OM CC G and C 2 G 25 Diagrams Schematics ...