-34-
G0453W/ZW–G0454W/ZW (Mfd. Since 05/16)
SECTION 6: MAINTENANCE
Schedule
To reduce risk of shock or
accidental startup, always
disconnect machine from
power before adjustments,
maintenance, or service.
Vacuum excess wood chips and sawdust, and
wipe off the remaining dust with a dry cloth. If any
resin has built up, use a resin dissolving cleaner
to remove it.
Protect the unpainted cast iron table by wiping
it clean after every use—this ensures moisture
from wood dust does not remain on bare metal
surfaces. Keep the table rust-free with regular
applications of products like G96
®
Gun Treatment,
SLIPIT
®
, or Boeshield
®
T-9 (see
Page 33 for more
details).
Lubrication
Cleaning &
Protecting
For optimum performance from your machine,
follow this maintenance schedule and refer to any
specific instructions given in this section.
Note: This maintenance schedule is based on
average daily usage. Adjust the maintenance
schedule to match your usage, to keep your planer
running smoothly, and to protect your investment.
Every 8 Hours of Operation:
•
Clean machine and protect unpainted cast-
iron.
•
Lubricate feed rollers bushings (
Page 35).
•
Tighten loose mounting bolts.
•
Check/sharpen/replace damaged or worn
knives (
Page 27).
•
Check/repair/replace worn or damaged wires.
•
Resolve any other unsafe condition.
Every 40 Hours of Operation:
•
Clean cutterhead and check knife height
(
Page 27).
•
Lubricate table columns and leadscrews
(
Page 35).
Every 160 Hours of Operation:
•
Check/tension/replace V-belts (
Page 40).
•
Clean/vacuum dust buildup from inside cabi-
net and off motor.
•
Lubricate table height worm gear (
Page 35).
•
Lubricate table height chain and sprockets
(
Page 35).
•
Lubricate drive chain and sprockets (
Page 36).
Yearly:
•
Change gearbox oil (
Page 36).
Your planer features bearings that are lubricated
and sealed at the factory. These bearing do not
require any further attention unless they need
to be replaced. If a bearing fails, your planer will
probably develop a noticeable rumble or vibration,
which will increase when the machine is under a
load. The bearings are standard sizes and can be
replaced through Grizzly.
Follow the maintenance schedule on this page
and the procedures beginning on
Page 35 to
properly lubricate the other planer components,
which are essential for long life and trouble-free
operation of your planer.
NOTICE
Failure to follow reasonable lubrication
practices as instructed in this manual for
your machine could lead to premature fail-
ure of components and void the warranty.
Содержание G0453W
Страница 76: ......