background image

Beijing Grinder Instrument Co., Ltd. Tel

010-82363430

Fax

010-82363435

www.grindertech.cn

28

4

3

1

Interface

2

5

Fig

5.17.2-1

Fig

5.17.2-2

6.0 Routine

6.1 Clean

First step

stop CM100M.

Second step

Remove the power code and cut off the power before cleaning.

Third step

open the grinding chamber door.

Содержание CM100M

Страница 1: ...Manual of Multi functional Mill CM100M ...

Страница 2: ... 4 2 Electrical parameters 12 4 3 Feed size 12 4 4 Collecting bucket 13 4 5 Instrument size 13 4 6 Weight 13 4 7Floor space 13 5 0 Installation 13 5 1 Instrument units fig 5 1 1 fig 5 1 5 13 5 2 Spare parts function list 15 5 3 Open close grinding room door fig 5 3 1 5 3 2 17 5 4 Install replace the cutting type accessories fig 5 4 1 5 4 4 18 5 5 Install replace the cross beater type accessories 1...

Страница 3: ...r Instrument Co Ltd Tel 010 82363430 Fax 010 82363435 www grindertech cn 2 5 17 Install the cyclone 26 6 0 Routine 28 6 1 Clean 28 6 2 Maintenance 29 6 3 Functional inspections 29 6 4 Copyright 29 6 5 Modification 29 ...

Страница 4: ...cing different type of grinding accessories can achieve three different grinding functions to expand application scope greatly The three kinds of grinding accessories are modular design which can replace each of them easily with short time CM100M with 1500W three phase frequency control motor and work in with transformer to make the speed can be adjusted continuously from 500 4000rpm so as to meet...

Страница 5: ...aging Please keep the packing materials during the warranty period Otherwise we shall not be able to guarantee your rights in case of packing complaint Transport The machine may not be knocked shaken or thrown during transport So as not to damage the electronic and mechanical parts of the instrument Temperature change If CM100M is subjected to large temperature changes such as in air transport the...

Страница 6: ... during the warranty period so that when the equipment is defective and you need to have it shipped back intact to avoid any damage during transit 3 2 Transportation During transportation please do not throw knock or oscillate so as not to damage the electronic and mechanical parts of the instrument Note If the temperature changes greatly e g air transport condensation water should be prevented to...

Страница 7: ...ent temperature exceeds or falls below that specified the electronic and mechanical components may be damaged And performance data changed to an unknown extent 3 6 Air humidity At a higher air humidity the electronic and mechanical components may be damaged and performance data changed to an unknown extent 3 7 Base frame installation fig3 7 1 3 7 4 The base frame is included in CM100M main machine...

Страница 8: ...he supplied screws and tools fig 4 5 2 4 5 3 Fig 3 7 2 fig 3 7 3 Screws M8 16 hexagon socket head screws 4pcs Tool 5mm hexagon socket wrench 1pc The final installed base frame BBS Fig 3 7 4 Fig 3 7 4 3 8 Installation main body Fig 3 8 1 3 8 4 If the instrument is transported in separate packing the base frame and main body should be installed on site The installation steps as following ...

Страница 9: ...cs of transporting fixed screws SC and 2 pcs of fixing parts TA with supplied screws and tool Fig 3 8 1 fig 3 8 1 Tool 13mm open spanner 1pc Screws SC M8 25 hexagon socket head screws 4pcs Installation step fig 3 8 2 3 8 3 Please place the main body on the base frame BSS and fixed them with 4 pcs of screws SC fig 3 8 2 SC TA ...

Страница 10: ... connection fig 3 9 The voltage and frequency of the power supply have been marked on the nameplate Ensure that the voltage is in line with the actual conditions please use the supplied CM100M power cord Fuse specification 10A 250VAC 4 0 Technical specifications 4 1 Introduction of function characters Function CM1OOM can handle batch quantity samples please open the grinding chamber door and remov...

Страница 11: ...e unique grinding accessories shape and the variable frequency drive device which is ensure rapid and high efficiency grinding progress and without the influence of the sample properties Not suitable for wet grinding It is not suitable for grinding humid materials The rotor and grinding sets can be removed out for instrument cleaning The speed can be adjusted from 500 4000 rpm continuous 4 1 1 Cut...

Страница 12: ...363430 Fax 010 82363435 www grindertech cn 11 Fig 4 1 2 1 Fig 4 1 2 2 4 1 2 Cross beater type CM100M2 fig 4 1 2 1 4 1 2 2 Suitable for hard medium hard and brittle samples grinding Feature The bottom sieves can control the samples final fineness ...

Страница 13: ...ium hard sample grinding Feature Draw type rotor and the collecting device is easy to clean 360 C and 180 C two type of ring sieves as option the powerful 180 C ring sieve more suitable for medium hard and brittle samples 4 2 Electrical parameters Rated voltage 220V 50Hz Rated power 1500W Motor speed 500 4000rpm adjustable continuously 4 3 Feed size CM100M1 70 80mm CM100M2 25mm CM100M3 25mm ...

Страница 14: ...olume of collecting bucket is up to 5 L 4 5 Instrument size From grinding chamber to motor 310x 550x 240 mm Base frame 660x 700x 850 mm Loner hopper 300x 300x 300 mm Collecting bucket diameter 192 x 201 mm 4 6 Weight Net Weight approx 120kgs 4 7Floor space 1m x 1m 5 0 Installation 5 1 Instrument units fig 5 1 1 fig 5 1 5 ...

Страница 15: ...nt Co Ltd Tel 010 82363430 Fax 010 82363435 www grindertech cn 14 fig 5 1 1 Accessories of CM100M1 cutting type fig 5 1 2 M1 1 M1 2 M1 3 M1 4 M1 5 M1 6 fig 5 1 2 Accessories of cross beater type CM100M2 fig 5 1 3 M1 1 B C A D ...

Страница 16: ... 82363435 www grindertech cn 15 E2 E3 E1 F E M2 1 M2 2 M2 3 M2 4 fig 5 1 3 Accessories of rotor beater type CM100M3 fig 5 1 4 M3 1 M3 2 M3 3 M3 4 M3 5 fig 5 1 4 fig 5 1 5 5 2 Spare parts function list No Name Function Remark A Hopper Feed samples Suitable for ...

Страница 17: ...e for CM100M 1 M1 4 Bottom sieves Control the samples final fineness Suitable for CM100M 1 M1 5 Feed hopper Universal feed hopper Suitable for CM100M 1 M1 6 Feed hopper Standard feed hopper Suitable for CM100M 1 M2 1 grinding room door feed hopper and handle for cross beater type Feed samples seal up the grinding room Suitable for CM100M 2 M2 2 accessories for cross beater type cutting samples and...

Страница 18: ...rinding room Suitable for CM100M 3 M3 3 Rotor of cross beater type Cut samples Suitable for CM100M 3 M3 4 Accessories of rotor beater type grind samples and installed it in the grinding room and match to the 360 C ring sieves Suitable for CM100M 3 M3 5 Accessories of rotor beater type grind samples and installed it in the grinding room and match to the 180 C ring sieves Suitable for CM100M 3 E Mai...

Страница 19: ...lace the cutting type accessories fig 5 4 1 5 4 4 First step Installing the grinding set M1 2 please align the slot I 3 places totally with limited post G 3 places totally and the outlet J match to the bottom outlet and turn the M1 2 to the innermost the 2 limited holes L should match to limited post H when install the M1 2 with position Refer to fig 5 4 1 5 4 3 Second step insert the rotor M1 3 i...

Страница 20: ... www grindertech cn 19 J K I L I M1 4 M1 3 M N M1 4 M1 3 N G H M1 2 I Fig 5 4 1 Fig 5 4 2 fig 5 4 3 Fig 5 4 4 5 5 Install replace the cross beater type accessories M1 M2 fig 5 5 1 5 5 6 First step remover the hopper M1 5 or M1 6 from M1 and unscrew and take away the 4 ...

Страница 21: ...he door hopper and grinding accessories of M2 2 to the hinge of grinding chamber refer to fig 5 5 2 Sixth step Install the parts of M2 4 please align the slot Q 3 places totally with limited post G 3 places totally and the outlet port R match to the bottom outlet of M2 and turn it to the innermost position the 2 limited holes should insert to the limited post H when with right position Refer to fi...

Страница 22: ...e it away refer to fig 5 6 1 Second step remove the rotor of M2 2 loosen and remove hexagon head screw T in anticlockwise direction from the axle X with s supplied 6mm hexagon socket wrench refer to fig 5 6 1 Third step M2 5 remove grinding accessories M2 4 and bottom sieve M2 5 refer to fig 5 6 1 Forth step Install M3 1 install M3 1 door hopper and accessories of M3 2 on the hinge of grinding cha...

Страница 23: ...h hands the 2 limited holes V should insert to the limited post H when with right position Refer to fig 5 6 2 5 6 4 Sixth step Install the rotor of M3 3 insert the M3 3 into the axle K and press it into innermost place and fix the M3 3 to the drive shaft K with a pc of hexagon head screw T M8 90 refer to fig 5 6 5 5 6 6 Note replace the grinding accessories with opposite order Fig 5 6 1 fig 5 6 2 ...

Страница 24: ... 2 6 5 Fig 5 6 5 fig 5 6 6 5 7 Collecting bucket installation fig 5 7 Hang the collecting bucket C Locking clamp W Fig 5 7 5 8 Control panel fig 5 8 fig 5 8 5 9 Control panel function list No Name Function 1 display parameter setting and control the instrument 2 Digital display tube Display the running speed ...

Страница 25: ...terial Note Excess sample amount will lead to instrument and components damages The maximum feed size must not exceed specified feeding otherwise it s lead to instrument break down and cause components damages Fill the sample material slowly and continuously into the feed hopper while the device is running Danger of breathing in dust hazardous to health Pay attention to the dust ingredients in the...

Страница 26: ... feed port Fifth step Close the cover of hopper X Sixth step put down the hopper plug Y fig 5 12 5 13 Standard hopper Fig 5 13 The application for standard hopper Cable waste Abandoned carpets similar materials like straw and grass Similar materials like tree branch Operating method of standard hopper fig 5 13 First step start CM100M Second step feed the samples into hopper Third step push the sam...

Страница 27: ...16 Using the cyclone CM100M can connect with cyclone when need to collect some light samples eg plastic bag paper bag and packing material for milk products 5 17 Install the cyclone 5 17 1 Function introduction of parts fig 5 17 1 1 cover of cyclone 2 feeding hopper of cyclone 3 Cover of collecting bucket 4 Lock 5 5L collecting bucket 6 Supplied handle of cyclone 7 supplied bar 8 outlet hopper of ...

Страница 28: ...ed handle 6 on the supplied bar 7 Forth step fixing the outlet hopper 8 onto the outlet ring 10 with 4 pcs of hexagon socket head screws M4x8 refer to fig 5 17 2 1 Fifth step Insert the feed hopper 2 into the round hole of outlet hopper 8 and adjusted with available height and fasten them with hand wheel Sixth step install the cover 3 to the hopper 2 thread connection Seventh step fix the bucket 5...

Страница 29: ...3430 Fax 010 82363435 www grindertech cn 28 4 3 1 Interface 2 5 Fig 5 17 2 1 Fig 5 17 2 2 6 0 Routine 6 1 Clean First step stop CM100M Second step Remove the power code and cut off the power before cleaning Third step open the grinding chamber door ...

Страница 30: ...afety switch one time half a year First step open the grinding chamber room and get out all grinding setting Second step press START key and the instrument can not work any more Third step Close grinding chamber room and press START and instrument work Note Please keep contact with GRINDER and inform relative distributor if the instrument can work when the grinding chamber room is opening It s dan...

Отзывы: