Beijing Grinder Instrument Co., Ltd. Tel
:
010-82363430
Fax
:
010-82363435
7
BSS
Installation step
:
Fasten the base BS with left roller rail LR and right roller rail RR with the supplied
screws and tools.(fig 4.5-2~4.5-3)
Fig 3.7.2
fig
3.7.3
Screws
:
M8×16 hexagon socket head screws* 4pcs
Tool
:
5mm hexagon socket wrench *1pc
The final installed base frame BBS (Fig 3.7.4)
Fig 3.7.4
3.8 Installation main body
(
Fig 3.8.1~3.8.4
)
If the instrument is transported in separate packing, the base frame and main body
should be installed on site. The installation steps as following:
Содержание CM100M
Страница 1: ...Manual of Multi functional Mill CM100M ...