5.1
Action upon delivery
This equipment may be installed directly by the OPERATOR or RESPONSIBLE
AUTHORITY.
5.2
Installation requirements
The requirements for the place where the equipment is to be installed are as
follows:
-
If the equipment has been stored in environmental conditions different
from work conditions, it should be kept for at least one hour under
environmental work conditions before being plugged in.
-
Environmental conditions: See section 3.1 “Technical specifications”.
-
Space requirements: The equipment occupies a horizontal area of
width 500 mm and 600 mm in depth (includes space for connection of
the mains cord connection).
-
Leave a safety space for additional installation of at least 300 mm
around the centrifuge. No person or any dangerous material should be
within this area whilst the centrifuge is in operation.
-
Do not place the equipment out of doors.
-
Do not place the equipment where it could get wet.
-
Do not place the equipment on an inflammable material surface.
-
Do not position the equipment so that it is difficult to operate the
mains switch (Ref. (6), Figure 2).
-
Do not let the equipment or its flexible cord come into contact with
surfaces which are too hot to touch.
-
Do not place anything on top of the equipment.
-
The electrical installation to which the equipment will be connected
should comply with the necessary requirements of power supply,
consumption and regulations (including protective earth).
-
The plug should have a protective earth.
-
The surface chosen to install the
DG Spin
centrifuge should be perfectly
flat, horizontal and stable.