Please read all installation instructions carefully prior to proceeding with these steps. Use the
following worksheet for checking off the commissioning steps and recording measured values.
The following steps require flow in the pipe. Flow signal readings should be taken while holding
the flow rate constant, if possible. Otherwise, take the various output readings as quickly as
possible.
STEP
TEST/MEASUREMENT
S/N:
S/N:
S/N:
S/N:
1.
Meter location:
2.
Confirm pipe size:
3.
Insertion depth
and orientation:
4.
Control system
programming:
5.
Match display or Btu
meter serial number
(S/N) if ordered:
6.
Signal connections
verified:
7.
Supply voltage verified:
8.
Connect power:
The following steps require flow in the pipe. Flow signal readings should be taken while holding the flow rate
constant if possible, otherwise, take the various output readings as quickly as possible.
9.
Frequency output(s):
Avg = green
Average frequency (Hz):
Average frequency
(VDC):
Calculated flow rate:
Hz
VDC
GPM
Hz
VDC
GPM
Hz
VDC
GPM
Hz
VDC
GPM
10.
Analog or pulse
output(s)
4-20 mA signal:
0-5 / 0-10 V signal:
Scaled output interval:
Calculated flow rate:
mA
VDC
GPM
mA
VDC
GPM
mA
VDC
GPM
mA
VDC
GPM
11.
Flow rate displayed
by control system:
GPM
GPM
GPM
GPM
4.3 START-UP AND COMMISSIONING WORKSHEET