Begin by calculating the effort that will be required to hold the meter. Establish adequate footing 

for this task, taking extra caution when working from a ladder or platform. Use the following 

formula: 

 

E=0.11 x P 

Where: 

E = effort in pounds 

P = system pressure in pounds per square inch 

Example: In a 300 PSI system, 33 pounds of effort is required to insert the meter into the pipe. 

3.3.1   Inserting the Flow Meter

 

 

 

 

WARNING

 

SYSTEM  MAY  BE  UNDER  HIGH  PRESSURE.  When  adjusting  the  meter  position  or  removing 

it, be sure to hold the electronics enclosure firmly by hand before SLOWLY loosening the 

positioning clamping nut. Failure to do this will allow the pressure to suddenly and rapidly 

force the meter from the pipe causing serious injury. The meter could also be damaged or break 

apart causing a break in the water seal with the resultant loss of large amounts of water. The 

hand effort required to hold the meter will be 0.11 times the pipe pressure. 

3.3 

INSERTION OF THE METER

 

Содержание ISM 5.0

Страница 1: ...www greyline com USER S GUIDE Installation Operation Instructions Insertion Magmeter Model ISM 5 0 Manual Series 1 2 ...

Страница 2: ...Note This page has been left blank intentionally ...

Страница 3: ...ISM 5 0 INSERTION MAGMETER Installation and Operation Guide www greyline com ...

Страница 4: ...umes no responsibility for any such harm owing to any defects in the product which were not predictable or for any indirect damages Safety Precautions The following general safety precautions must be observed during all phases of installation operation service and repair of this product Failure to comply with these precautions or with specific WARNINGS given elsewhere in this manual violates safet...

Страница 5: ...tallation Hardware Kit 11 3 3 4 Customer Supplied Installation Hardware 12 3 3 5 Confirming the Stack Height 13 3 3 6 Installing Grounding Rings 14 3 3 7 Installing the Flow Meter 15 3 4 INSERTION OF THE METER 16 3 4 1 Inserting the Flow Meter 16 REMOVAL OF THE METER 17 3 5 WIRING CONNECTIONS 18 3 5 1 Signal and Power Wiring Connections 18 3 5 2 Earth Connection 20 4 1 START UP COMMISSIONIING FOR ...

Страница 6: ...converts the voltage to digital and analog signals that convey flow rate and total data via connecting the cable to any of GREYLINE s display devices Btu meters and or to a data acquisition system Typical Meter Installation New construction or scheduled shutdown Customer provided conduit and adapters Install in vertical or horizontal pipe Forhorizontalpipeposition meter anywhere in upper 240 Outpu...

Страница 7: ...V peak pulse 0 500 Hz maximum Scalable pulse output isolated dry contact contact rating 50 VDC 100 mA maximum pulse duration 0 5 1 2 or 6 seconds This product is covered by one or more of the following patents 6 431 011 and 6 463 807 All GREYLINE insertion type meters can be installed and removed via a 1 or larger full port ball valve without system shutdown The terms Standard and Hot Tap refer to...

Страница 8: ...ass 150 316 Stainless Steel Grounding Rings pair Nominal Size GREYLINE Part 1 19265 1 19266 2 19267 3 19268 4 19269 6 19270 8 19271 10 19272 12 19273 14 19274 16 19275 18 19276 20 19277 24 19278 30 19279 36 19280 42 19281 1 5 ADDITIONALHARDWARETHATMAYBEREQUIRED Grounding Rings GroundingRingDimensions Nominal Size Bore A C D 1 1 1 16 2 5 8 4 9 16 1 15 16 1 5 1 9 16 3 3 8 5 5 16 1 15 16 2 2 1 16 4 1...

Страница 9: ... abrasions The sensor head should have a smooth continuous surface that is free of abrasions All GREYLINE products are shipped insured unless the customer specifically requests otherwise Please notify the shipping company and GREYLINE immediately if any items are damaged in transit Save all packing material for inspection by the shipper Standard Documentation Enclosed with each meter is a comprehe...

Страница 10: ...ocation details more or less straight run may be required to produce a satisfactory flow profile 3 If there is insufficient straight run allow 80 of the run upstream and 20 of the run downstream If the total length of straight run is less than 70 of the recommended length performance may seriously degrade IMPORTANT NOTE Always use the maximum available straight run When more than the minimum requi...

Страница 11: ... 30 Diameters Inflowing tee 30 Diameters Control Modulating valve 30 Diameters Installation with Grounding Rings with Non conductive Pipe Gaskets 4 pl 5 DIA 10 DIA Grounding Rings 2pl Additional straight run may be required upstream of the upstream grounding ring based on the nature of the upstream obstruction Refer to the chart above to determine how much straight run is required Acceptable to in...

Страница 12: ...stalled through oversized access holes will be subjected to undesirable turbulence that may affect the accuracy of the meter i CAUTION GREYLINE insertion style flow meters must be installed through a valve assembly Failure to do so negates the ability to remove the meter without shutting down and draining the system It will also result in an excessive amount of stem protruding from the pipe Excess...

Страница 13: ...onal bushings to properly size the opening 3 2 2 GREYLINE Standard Installation Hardware Kit Standard installation hardware kits are designed to be installed on piping systems that are drained and at atmospheric pressure The access hole is drilled 1 minimum prior to installation of the branch outlet with 1 NPT threads close nipple and full port ball valve Once the isolation valve is installed the ...

Страница 14: ...and allow for insertion Make sure that your valves and fittings are full port and at least 1 in actual internal diameter Installation hardware generally consists of three separate component parts And a full port isolation valve CAUTION Use stainless steel or brass nipple only CAUTION In order to provide the flow meter with the correct stem length GREYLINE must know the over all height of the insta...

Страница 15: ...minated insertion depth gage tag attached to the meter Prior to installing the meter confirm that the stack height recorded on the tag is close to the actual stack height Flow meter stems are intentionally oversized to allow for variations of at least 2 in the stack height Contact GREYLINE prior to installation if there is any question regarding stack height or stem length This way GREYLINE can of...

Страница 16: ...pipes Installation Instructions 1 Install the rings upstream and downstream of the meter as shown above Please note that the straight run requirements shown above are only for locating the grounding rings with respect to the ISM 5 0 flow meter The complete straight run requirements for this meter are found in Section 3 1 on page 11 of this manual 2 Install each grounding ring sandwiched between 2 ...

Страница 17: ...that the O ring is not sealing properly and you must contact GREYLINE for assistance Tools needed for standard installation 15 16 wrench or adjustable wrench 5 8 wrench or small adjustable wrench pipe wrench to hold valve in place pipe thread sealant WARNING When you are ready to refill the system make sure that all lines are filled with water before inserting the meter into the flow stream If the...

Страница 18: ... 1 Inserting the Flow Meter WARNING SYSTEM MAY BE UNDER HIGH PRESSURE When adjusting the meter position or removing it be sure to hold the electronics enclosure firmly by hand before SLOWLY loosening the positioning clamping nut Failure to do this will allow the pressure to suddenly and rapidly force the meter from the pipe causing serious injury The meter could also be damaged or break apart caus...

Страница 19: ... Usually a gentle twisting motion while withdrawing the meter will clear any obstruction and permit the meter to withdraw completely Excessive build up on the stem may require the hot tap O ring to be lubricated with silicone WARNING SYSTEM MAY BE UNDER HIGH PRESSURE When removing the flow meter be sure to hold the electronics enclosure firmly by hand before slowly loosening the positioning clampi...

Страница 20: ...UTION Do not attempt to remove the existing cable or to remove the factory installed connection fitting Doing so will compromise the weather tight integrity of the enclosure and will void the warranty CAUTION Only qualified personnel should attempt to make electrical connections to the ISM 5 0 Failure to properly connect the ISM 5 0 power signal or earth connections may result in damage to the ISM...

Страница 21: ...aled Pulse Output Gray Scaled output isolated dry contact 50 VDC 100 mA maximum Dry contact scaled to provide one pulse per volumetric unit Examples 1 pulse per 10 gal 1 pulse per 100 gal Violet Scaled output isolated dry contact 50 VDC 100 mA maximum Frequency Output Green Isolated frequency output 0 500 Hz maximum Required when meter is connected to local display or BTU meter Yellow Frequency ou...

Страница 22: ...that the meter is properly connected to earth the flow meter earth cable should be run directly to a known earth connection The length of this earth cable should be as short as practically possible preferably 25 feet in length The table below lists earth connections from best to worst If necessary a separate earth cable should be connected to the metal pipe near the meter Earth Connections strande...

Страница 23: ...ing analog output signals remember that current mA must be measured in series while voltage is measured in parallel If the 4 20 mA signal is already connected to a control system you must break the connection and measure the signal in series 4 When measuring frequency outputs in Hz take your multimeter out of autorange mode and manually set the range for a voltage level above 15 VDC This will prev...

Страница 24: ...th GREYLINE display or Btu meter If in doubt contact GREYLINE for assistance before proceeding further 7 Confirm correct supply voltage Verify that 24 4 V is available 8 Connect power Wait approximately 45 seconds after power on before proceeding further The following steps require flow in the pipe Flow signal readings should be taken while holding the flow rate constant if possible Otherwise take...

Страница 25: ...rogramming 5 Match display or Btu meter serial number S N if ordered 6 Signalconnections verified 7 Supply voltage verified 8 Connect power The following steps require flow in the pipe Flow signal readings should be taken while holding the flow rate constant if possible otherwise take the various output readings as quickly as possible 9 Frequency output s Avg green Average frequency Hz Average fre...

Страница 26: ...actor Verifythat the meter earth cable is connected to earth A poor earth connection can lead to excessive noise that can affect the flow reading Analog signal seems high or low and does not correspond to frequency output Check for ground loop or offset voltage Disconnect analog signal input from control system and measure analog output directly from the flow meter Reconnect signal input to contro...

Страница 27: ... In order to minimize the effects of noise it is helpful to understand which of the following conditions are present Earth Connection at Flow Meter Pipe Fluid Earth Connection Expected Noise Level Possible Remedies Good earth connection 25 feet from flow meter Pipe fluid are connected to earth Low None required Good earth connection 25 feet from flow meter Pipe fluid are not connected to earth Mod...

Страница 28: ... Buyer agrees to reimburse GREYLINE for such tax or charge or provide GREYLINE with an acceptable exemption certificate Payment of invoices will be due 30 days from the date of shipment of the products contained therein In the event that payment of an invoice is not received by the invoice due date GREYLINE will assess a late fee not to exceed 1 5 per month or 18 per year or the maximum allowable ...

Страница 29: ...repair 1 Obtain an RMA Number from Greyline Before shipping a product to the factory please contact Greyline by telephone fax or email to obtain an RMA number Returned Merchandise Authorization This ensures fast service and correct billing or credit When you contact Greyline please have the following information available 1 Model number Software Version 2 Serial number 3 Date of Purchase 4 Reason ...