SENSOR MOUNTING
Prepare an area 2" wide by 4" long (50mm x 100mm) for sensor bonding by removing loose paint, scale
and rust. The objective of site preparation is to eliminate any discontinuity between the sensor and the
pipe wall, which would prevent acoustical coupling.
A PC3 Sensor Mounting Kit is supplied with each Greyline flow meter. It includes recommended
coupling compound in a plastic applicator and a stainless steel mounting bracket with adjustable pipe
straps.
DFM-IV Doppler Flow Meter
Manual Series A.6
Page 12
PIPE
Mount the PC3 pipe clamp as illustrated on pipes
0.6" / 15 mm OD or larger. Stainless steel bands are
included for mounting on pipes up to 32" / 81 cm OD.
Additional stainless steel bands (by customer) may be
combined to mount on pipes up to 180" / 4.5 m OD.
END VIEW
SENSOR
ADJUSTABLE
STAINLESS
STEEL STRAP
PIPE
PIPE
SENSOR
PIPE