GREISINGER GIR 230 NTC / DIF Скачать руководство пользователя страница 9

E33.0.31.6C-02     

Manual for connection and operation of the GIR230 Pt1000 / DIF and GIR230 NTC /DIF

          Page 9 of 14

Now you finished configuring the switching points of your device. Press button 1 to switch over to display the
measuring value.

5.2. 2-point-controller with alarm function, 3-point-controller with alarm function

This chapter describes how to configure the device as a 2-point-controller with alarm function or 3-point-
controller with alarm function. This instruction demands that you selected “

2P.AL

“ or “

3P.AL

“ as your desired

output function.

- Press button 1 

(when not already done). 

The device will be displaying “

1.on

“ (turn-on-point of output 1).

- Use button 2 and button 3 to set the desired value, the device’s output 1 should be turning on.

- Press button 1 to validate your selection. The display shows “

1.on

“ again.

- When pressing button 1 again, the device will be displaying “

1.off

“. (turn-off-point of output 1)

- Use button 2 and button 3 to set the desired value, the device’s output 1 should be turning off.

- Press button 1 to validate your selection. The display shows “

1.off

“again.

Example: You want to control the temperature of a cooling chamber between –20°C and –22°C.              

Therefor you will have to select –20°C for the turn-on-point 1 “1.on“ and –22°C for the turn-off-
point 1 “1.off“. When the temperature rises above –20°C the device turns its output 1 on, when
falling below –22°C the device will turn its output 1 off .

Note: Depending on the inertia of your cooling circuit an overshooting of the temperature may be possible.

.

When selected '3-point-controller with alarm function', you have to select the switching points for the second
switching function (“

2.on

“, “

2.off

“). Configuring these settings like the first switching function.

After that the alarm outputs have to be configured.

- When pressing button 1, the device will be displaying “

AL.Hi

“. (maximum alarm-value)

- Use button 2 and button 3 to set the desired value, the device should turn on its maximum-alarm.

- Press button 1 to validate your selection. The display shows “

AL.Hi

“ again.

- When pressing button 1 again, the device will be displaying “

AL.Lo

“. (minimum alarm-value)

- Use button 2 and button 3 to set the desired value, the device should turn on its minimum-alarm

- Press button 1 to validate your selection. The display shows “

AL.Lo

“ again.

- When pressing button 1 again, the device will be displaying “

A.dEL

“. (delay of the alarm-function)

- Use button 2 and button 3 to set the desired delay of the alarm-function.

  Note: The unit of the value to be set [0 .. 9999] is in seconds. The device will turn on the alarm after

the minimum or maximum alarm value was active for the delay-time you have set.

- Press button 1 to validate the delay time. The display shows “

A.dEL

“ again.

Example: You want to have an alarm monitoring for the cooling chamber mentioned above. The alarms

should start when the temperature will be rising above –15°C or falling below –30°C.
Therefore you have to select –15°C for the maximum alarm-value “Al.Hi“ and –30°C for the mini-
mum alarm-value “AL.Lo“.
The alarm will be starting after the temperature rises above –15°C and stays above –15°C for the
entered delay time or after it had been falling below –30°C and stays below –30°C for the entered
delay time.

Please note that the alarm-outputs are inverted! This means, that the output will be active if there is no
alarm!

Now you finished configuring your device. Press button 1 to switch over to display the measuring value.

Содержание GIR 230 NTC / DIF

Страница 1: ...E33 0 31 6C 02 Manual for connection and operation of the GIR230 Pt1000 DIF and GIR230 NTC DIF Page 1 of 14 Manual for connection and operation of GIR 230 Pt1000 DIF GIR 230 NTC DIF Version 1 3...

Страница 2: ...relay outputs 5 3 4 2 Connection of output 3 NPN output switching to ground 5 4 CONFIGURATION OF THE DEVICE 6 4 1 Selecting an input signal type 6 4 2 Selection of the output function 7 5 SWITCHPOINT...

Страница 3: ...he device must be switched off and must be marked against re starting in case of obvious malfunctions of the device which are e g visible damage the device is not working as prescribed after storage o...

Страница 4: ...factory the GIR230 has been subjected to various inspection tests and is completely cali brated Before the GIR230 can be used it has to be configured for the customer s application Hint In order to av...

Страница 5: ...switching outputs properly Please take care that you must not exceed the limits of the voltage and of the maximum current of the switching outputs not even for a short period of time Please take extr...

Страница 6: ...the device switches to the lower limit vice versa 4 1 Selecting an input signal type Turn the device on and wait until it completed its built in segment test Press button 2 for 2 sec The display will...

Страница 7: ...you have to configure the preferred states and delay time of the outputs and the switch and alarm points Depending on your output function setting it may be possible that one or more settings describ...

Страница 8: ...ss button 1 when not already done The device will be displaying 1 on turn on point of output 1 Use button 2 and button 3 to set the desired value the device s output 1 should be turning on Press butto...

Страница 9: ...points for the second switching function 2 on 2 off Configuring these settings like the first switching function After that the alarm outputs have to be configured When pressing button 1 the device w...

Страница 10: ...stays above 50 C for the entered delay time or after it had been falling below 15 C and stays below 15 C for the entered delay time Please note that the alarm outputs are inverted This means that the...

Страница 11: ...1 slope adjustment 1 100 Example The setting is 2 00 the slope has risen 2 00 slope 102 When measuring a value of 1000 without slope adjustment the device would display 1020 with slope adjustment of 1...

Страница 12: ...s check probe and device configuration Err 7 System error The device features an integrated self diagnostic function which checks essential parts of the de vice permanently When detecting a failure er...

Страница 13: ...ty 5A 230VAC resistive load NPN output NPN Open Collector breaking capacity 30mA max 28VDC Output functions 2 point 3 point 2 point with alarm 3 point with alarm min max alarm Switching points arbitra...

Страница 14: ...E33 0 31 6C 02 Manual for connection and operation of the GIR230 Pt1000 DIF and GIR230 NTC DIF Page 14 of 14...

Отзывы: