7.3
INSTALL THE UPPER HANDLE
1. Align the holes in the middle handle (15) and the upper
handle (14).
2. Put the bolts (17) through the holes.
3. Tighten the handle knobs (16) onto the bolts (17).
4. Do the same operation on the other side.
7.4
INSTALL THE CHUTE-ROTATION
BOX
18
23 24 19
1. Align the holes in the panel of the chute-rotation box (23)
and the switch box (24).
2. Put the chute-rotation box screws (18) through the holes.
3. Tighten the chute-rotation box screw nuts (19) with a
wrench (not included).
7.5
INSTALL THE CHUTE
DEFLECTOR
1. Align the grooves (26) of the discharge chute with the
slot (25) on the chute housing.
2. Push the discharge chute (7) into position.
3. Tighten the discharge chute screws (18) with a Phillips
head screw driver to lock the discharge chute.
7.6
INSTALL THE BATTERY PACK
WARNING
•
If the battery pack or charger is damaged, replace the
battery pack or the charger.
•
Stop the machine and wait until the engine stops before
you install or remove the battery pack.
•
Read, know, and follow the instructions in the battery
and charger manual.
1. Open the battery door (5).
2. Align the ribs on the battery pack (20) with the grooves in
the battery compartment.
3. Push the battery pack (20) into the battery compartment
until the battery pack (20) locks into place.
4. When you hear a click, the battery pack (20) is installed.
5. Close the battery door (5).
7.7
REMOVE THE BATTERY PACK
8
English
EN
17
16
14
15
7
26
25
18
5
20
21
Содержание 2605902
Страница 2: ...2605902 SNB403 ...
Страница 3: ......
Страница 4: ... 0 0 1 234 1 1 5 0 ...
Страница 16: ... w w w w w x 3 2 0 x z 4 Y 1 Y 1 Y 1 Y 1 Y Y Y B 4 Y Y Y 0 Y 432 3 Y Y Y Y 3 Y w w x w M w w X X ...
Страница 27: ... 0 0 BM 0 H X X X X X 2 X X X 4 0 z z 0 B H 2 X X 0 H 2 X 5 QB H H 5 5 1 4 1 X X X 2 X X ...
Страница 29: ... w 1 1 1 3 0 4 0 ª 0 X ª 4 ª 0 0 2 234 0 0 ª w M ...
Страница 40: ... B 0 B 0 H Y X X X X X 2 X Y 4 X X 4 0 0 X 0 H X 0 H 2 Y 3 Y 0 X 5 BB H H 5 5 1 4 1 X X X 2 ...