MAINTENANCE
REPLACING THE IMPELLER
(See Figure 12)
W A R N I N G
Make sure to turn off the bail lever and remove the battery pack(s) before performing any
maintenance task on your snow thrower.
• Remove the 4 sets of nuts and bolts on the middle steel plate.
• Remove the 4 sets of nuts and bolts on each side.
• Remove the impellers (1).
• Install the new impellers.
• Tigthen the 8 sets of nuts anf bolts that you removed.
4 sets of bolts nd nuts on each side
(total of 8 sets)
4 sets of nuts and bolts on the middle
steel plate
Fig. 12
24
1
Содержание GN 220
Страница 2: ......
Страница 30: ...29 EXPLODED VIEW 1 2 3 9 4 5 6 7 8 10 8 11 12 13 15 18 19 16 17 16 30 29 28 24 25 26 27 23 22 20 21 14...
Страница 32: ...TOLL FREE HELPLINE 1 855 470 4267 Greenworks Tools PO Box 1238 Mooresville NC 28115...
Страница 61: ...29 VUE CLAT E 1 2 3 9 4 5 6 7 8 10 8 11 12 13 15 18 19 16 17 16 30 29 28 24 25 26 27 23 22 20 21 14...
Страница 63: ...LIGNE D ASSISTANCE SANS FRAIS 1 855 470 4267 Greenworks Tools PO Box 1238 Mooresville NC 28115...
Страница 92: ...29 VISTA DESARROLLADA 1 2 3 9 4 5 6 7 8 10 8 11 12 13 15 18 19 16 17 16 30 29 28 24 25 26 27 23 22 20 21 14...
Страница 94: ......
Страница 95: ......
Страница 96: ...L NEA DE AYUDA GRATUITA 1 855 470 4267 Greenworks Tools PO Box 1238 Mooresville NC 28115...