CONDENSATION DRAIN LINE
Through normal operation and including defrost sequence, the ERV may produce some condensation. The excess condensation should flow into a near-
by drain if no drain is available a condensation pump will be required. The ERV and all condensate lines must be installed in a conditioned space where
the temperature is maintained above the freezing point. A “P” trap is required in the drain line, This will prevent odors from being drawn back up into
the unit.
Drain Fitting
To Drain
(or to condensation pump)
Tape or Tie
Wrap
"T" Connector
Connecting the drain hose with recommended “P” trap
To insure a quiet operation, vibration isolators (not included) are recommended for both applications.
SADDLE
INSTALLATION
3. MOUNTING OR HANGING THE ERV
SUSPENDED
INSTALLATION
Содержание LCH-12E
Страница 14: ...14 LOW SPEEDS 90V 75V J4 J5 J6 12 WIRING DIAGRAM LCH 4E...
Страница 15: ...15 LOW SPEEDS 90V 75V J4 J5 J6 13 WIRING DIAGRAM LCH 7E...
Страница 16: ...16 LOW SPEEDS 90V 75V J4 J5 J6 14 WIRING DIAGRAM LCH 12E...
Страница 18: ...50 Kanalflakt Way Bouctouche NB E4S 3M5 1 888 724 5211 Fax 1 866 426 7430 www greentek ca Item 444863...
Страница 32: ...32 12 SCH MA DE C BLAGE LCH 4E LOW SPEEDS 90V 75V J4 J5 J6...
Страница 33: ...33 13 SCH MA DE C BLAGE LCH 7E LOW SPEEDS 90V 75V J4 J5 J6...
Страница 34: ...34 14 SCH MA DE C BLAGE LCH 12E LOW SPEEDS 90V 75V J4 J5 J6...
Страница 36: ...50 Kanalflakt Way Bouctouche NB E4S 3M5 1 888 724 5211 Fax 1 866 426 7430 www greentek ca Item 444863...