5
Assemble the CF 4 container and add bulking material
1) Thread the drain elbow into the liquids outlet on the bottom of the unit. Ensure you finish with the
elbow pointing in the direction of the excess liquids drain.
2) Secure liquids drain hose onto elbow firmly and fasten with hose clamp. Position the bottom half of
the CF 4 into its final position.
3) Do not yet connect up with slotted aggregate pipe of the excess liquids trench.
4) Insert the drainage tray - spacer pipes at the bottom, and drain outlet service hole at the front.
5) Slide drain service pipe into the hole in the front left of the bottom tray, secure in place with
supplied bracket & screws and cap off (see below).
Cover floor tray with 50mm of supplied bulking material. Wet down with a spray hose.
Run a 4 - 6mm silicone bead around the center of the flange of the bottom unit (silicone and caulking gun
supplied).