background image

11

Dear Friend,

Thank you very much for choosing our CF 4 Bio Sanitation Systems.

We hope that you enjoy many years of fruitful, waterless, and
trouble-free use.

Please do not hesitate to contact us with any questions, suggestions,
we are here to help.

Feedback is always welcome and is an invaluable part of providing an
excellent product and service!

Finally, thank you for being an integral part of the environmental
solution. The Earth will thank you too!

“Save the World by Sitting Down!” ®

The Team at Green Loo

Green Loo NZ

23

Teviotview Pl

Amberley, 7410

[email protected].nz

@infogreenloo.org.nz

www.greenloo.org.nz

Содержание CF 4

Страница 1: ...DRY COMPOSTING TOILET Owners Installation Operation Manual for the CF 4...

Страница 2: ...ectrical supply 240VAC or 12VDC to the fan location unless the whirlybird option is selected The CF 4 is supplied as a kit containing most of the components required and can be installed using basic b...

Страница 3: ...ss Do not plan to install a light directly over the pedestal waste chute as this will attract flying insects Always close the lid of the toilet after use Do not use your bathroom fan Its suction works...

Страница 4: ...waste chute hole in the floor until you are sure you have everything lined up in case you need to adjust the position Prepare a flat level ground for the CF 4 and dig out the excess liquids trench Th...

Страница 5: ...s final position 3 Do not yet connect up with slotted aggregate pipe of the excess liquids trench 4 Insert the drainage tray spacer pipes at the bottom and drain outlet service hole at the front 5 Sli...

Страница 6: ...utting the chute to length Cut the waste chute hole in the toilet room floor to suit chute approx 250mm 2mm Insert the chute from above tapered end up through the hole you cut earlier Firmly rest the...

Страница 7: ...4 and draw a 260mm circle and cut out with a jigsaw or similar Cut the Dektite along the marked line to suit the 250mm chute and fit the Dektite centrally over the chute hole screwing it down with the...

Страница 8: ...oid bends tighter than 45 degrees in order to maximise air flow minimise the length of the piping between the composting container and the vent stack Warm air holding moisture entering a cold vent can...

Страница 9: ...ver any items containing plastic e g including sanitary products should be placed into a separate bin A handful of covering material hemp 1 cup should be added after each bowel movement The composting...

Страница 10: ...move the compost from the front of the unit as per steps 1 2 3 below a When the unit is full b after 6 months or c when fully broken down f Every 6 months check the excess liquids outlet via the servi...

Страница 11: ...questions suggestions we are here to help Feedback is always welcome and is an invaluable part of providing an excellent product and service Finally thank you for being an integral part of the environ...

Отзывы: