background image

15

Unit Installation

5.2 Test run

Test run is testing whether the unit can run normally via preoperation. If the unit cannot run normally, 

find and solve problems until the test run is satisfactory. All inspections must meet the requirements before 
performing the test run. Test run should follow the content and steps of the table below:

The following procedure should be executed by experience and qualified maintenance men.

No.

Start up the pretest procedure

Notice: before test, ensure that all power must be cut off, including the far- end power switch, otherwise, it may cause casualty.

1

Ensure that the compressor of the unit is preheated for 8h.

Caution:  heat the lubricating oil at least 8h in advance to prevent refrigerant from mixing with the lubricating oil, which may cause 

damage to the compressor when starting up the unit.

2

Check whether the oil temperature of the compressor is obviously higher than the outdoor ambient temperature.

Caution:  if the oil temperature of the compressor is obviously higher than the outdoor ambient temperature, it means that the heating 

tape of compressor is damaged. In that case, the compressor will be damaged easily. Therefore, repair the heating tape before using 
the unit.

3

Check whether the phase sequence of the main power supply is correct. If not, correct the phase sequence firstly.

Recheck the phase sequence before start-up to avoid reverse rotation of the compressor which may damage the unit.

4

Apply the universal electric meter to measure the insulation resistance between each phase and earth as well as between 
phases.

Caution: defective earthing may cause electric shock.

No.

Ready to start

1

Cut off all temporary power supply, resume all the insurance and check the electricity for the last time.

Check the power supply and voltage of the control circuit; _____V must be ±10% within the range of rated operating power.

No.

Start up the unit

1

Check all the conditions needed to start up the unit: oil temperature, mode, required load etc.

2

Start up the unit, and observe the operation of compressor, electric expanding valve, fan motor and water pump etc.

Note: the unit will be damaged under abnormal running state. Do not operate the unit in states of high pressure and high 
current.

Others: 

  

Items for 

acceptance after 

debugging

Estimation or suggestion on the general running situation: good, modify
Identify the potential problem (nothing means the installation and debugging are in accordance with the 
requirements.)
a. problem of power supply and electric control system: 
b. problem of load calculation:
c. refrigerant system:            
d. noise problem:
e. problem of indoor and piping system:      
h. other problems:
During operation, it is needed to charge for the maintenance due to non-quality problems such as incorrect 
installation and maintenance.

Acceptance

Is the user trained as required? Please sign. Yes(  )  No(  )

Содержание HLR10Pd/Na-K

Страница 1: ...Change for life GREE ELECTRIC APPLIANCES INC OF ZHUHAI Mini Chiller Unit Installation eries...

Страница 2: ...cation 6 4 4 Outline Dimension of the Mini Chiller 7 4 5 Installation Clearance Data 8 4 6 Electric Wiring 8 4 7 Wiring of the Terminal Board 9 4 8 Wiring of the 2 Way Valve 10 4 9 Wired Controller 11...

Страница 3: ...kitchen or the plastic would be aged broken off or the polluted evaporator would lead to water leak and poor performance Do not place the unit where there is corrosive gas like sulfur dioxide or the...

Страница 4: ...cording to installation manual 3 Do not connect to power until all installation work is completed 2 Filed Supplied Pipes and Valves Name Picture Usage Water Filter It is used to remove foreign matters...

Страница 5: ...nstallation Examples CASE 1 Connection of Terminals for Heating and Cooling Under floor Loop Fan Coil Unit and Radiator B M Under Floor Coil FCU 1 T Radiator B T Bypass valve field supplied High tempe...

Страница 6: ...maged The AC contactor control signal input terminal X17 AC contactor 1 and X18 AC contactor 2 of the main board AP1 should be connected to terminal 7 and terminal 8 of the electric box The single pin...

Страница 7: ...Installation Diagramof the Electric Heater with the thermostat 2 See the following statement for installation of two groups of auxiliary electric heaters including wiring of the AC contactors and the...

Страница 8: ...eet actual demands should be avoided Never open the electric box for wiring of the mainboard by the user themselves 4 2 Pre Installation 1 Installation of the unit must be in accordance with national...

Страница 9: ...7 Unit Installation 4 4 Outline Dimension of the Mini Chiller HLR8Pd Na K HLR10Pd Na K 1390 412 361 388 890 HLR12Pd Na M HLR14Pd Na M 367 340 1390 1430...

Страница 10: ...ng and moving must be 40 below to prevent center of the unit from moving 2 The monobloc unit should be installed on concrete base that is 10cm height 3 Requirements on installation space dimension of...

Страница 11: ...9 Unit Installation HLR12Pd Na M HLR14Pd Na M 4 7 Wiring of the Terminal Board HLR8Pd Na K HLR10Pd Na K...

Страница 12: ...ow Yes NC 2 wire 230V 50Hz 1Ph AC Closing water flow Yes Opening water flow Yes 1 Normal Open type When electric power is NOT supplied the valve is open When electric power is supplied the valve is cl...

Страница 13: ...ram At the field installation it should be wired at the terminal board of the 2 way valve 1 4 9 Wired Controller Wired controller wiring guidance 4 10 Wiring of Other Auxiliary Heat Sources Other auxi...

Страница 14: ...loor is approximately 1 5 meters Remote air temperature sensor can not be located where the area may be hidden when door is open Remote air temperature sensor can not be located where external thermal...

Страница 15: ...e product For other constrains please refer to previous pages about the remote air temperature sensor Do not connect external electric loads Wire 220V AC 24V AC and 220V GND 24V GND should be used onl...

Страница 16: ...g pipe proper 8 Are the nilometer of water tank water temperature indicator controller manometer pressure relief valve and automatic discharge valve etc installed and operated properly 9 Does power su...

Страница 17: ...ce firstly Recheck the phase sequence before start up to avoid reverse rotation of the compressor which may damage the unit 4 Apply the universal electric meter to measure the insulation resistance be...

Страница 18: ......

Отзывы: