2

Unit Installation

salty fog and polluted air.

1.2 Matters Need Attention

(1) The installation of unit must be in accordance with national and local safety codes.
(2) Installation quality will directly affect the normal use of air conditioner unit. The user is prohibited from 

installation by himself. Please contact your dealer after buying this machine. Professional installation workers 
will provide installation and test services according to installation manual.

(3) Do not connect to power until all installation work is completed.

2 Filed Supplied Pipes and Valves

Name

Picture

Usage

Water Filter

It is used to remove foreign matters in the 

waterway.

2-way Valve

It is used to switch waterways between underfloor 

system and the FCU.

3-way Valve

It is used to switch waterways of hot water inside 

the water tank and circulation water inside the main 

unit.

Bypass Valve

It is used to balance the water pressure.

Water Trap

It is used to distribute water.

Pipe Joint

It is used to connect the water pipes.

Cut-off Valve

It is used to cut off or get through the waterway.

Содержание HLR10Pd/Na-K

Страница 1: ...Change for life GREE ELECTRIC APPLIANCES INC OF ZHUHAI Mini Chiller Unit Installation eries...

Страница 2: ...cation 6 4 4 Outline Dimension of the Mini Chiller 7 4 5 Installation Clearance Data 8 4 6 Electric Wiring 8 4 7 Wiring of the Terminal Board 9 4 8 Wiring of the 2 Way Valve 10 4 9 Wired Controller 11...

Страница 3: ...kitchen or the plastic would be aged broken off or the polluted evaporator would lead to water leak and poor performance Do not place the unit where there is corrosive gas like sulfur dioxide or the...

Страница 4: ...cording to installation manual 3 Do not connect to power until all installation work is completed 2 Filed Supplied Pipes and Valves Name Picture Usage Water Filter It is used to remove foreign matters...

Страница 5: ...nstallation Examples CASE 1 Connection of Terminals for Heating and Cooling Under floor Loop Fan Coil Unit and Radiator B M Under Floor Coil FCU 1 T Radiator B T Bypass valve field supplied High tempe...

Страница 6: ...maged The AC contactor control signal input terminal X17 AC contactor 1 and X18 AC contactor 2 of the main board AP1 should be connected to terminal 7 and terminal 8 of the electric box The single pin...

Страница 7: ...Installation Diagramof the Electric Heater with the thermostat 2 See the following statement for installation of two groups of auxiliary electric heaters including wiring of the AC contactors and the...

Страница 8: ...eet actual demands should be avoided Never open the electric box for wiring of the mainboard by the user themselves 4 2 Pre Installation 1 Installation of the unit must be in accordance with national...

Страница 9: ...7 Unit Installation 4 4 Outline Dimension of the Mini Chiller HLR8Pd Na K HLR10Pd Na K 1390 412 361 388 890 HLR12Pd Na M HLR14Pd Na M 367 340 1390 1430...

Страница 10: ...ng and moving must be 40 below to prevent center of the unit from moving 2 The monobloc unit should be installed on concrete base that is 10cm height 3 Requirements on installation space dimension of...

Страница 11: ...9 Unit Installation HLR12Pd Na M HLR14Pd Na M 4 7 Wiring of the Terminal Board HLR8Pd Na K HLR10Pd Na K...

Страница 12: ...ow Yes NC 2 wire 230V 50Hz 1Ph AC Closing water flow Yes Opening water flow Yes 1 Normal Open type When electric power is NOT supplied the valve is open When electric power is supplied the valve is cl...

Страница 13: ...ram At the field installation it should be wired at the terminal board of the 2 way valve 1 4 9 Wired Controller Wired controller wiring guidance 4 10 Wiring of Other Auxiliary Heat Sources Other auxi...

Страница 14: ...loor is approximately 1 5 meters Remote air temperature sensor can not be located where the area may be hidden when door is open Remote air temperature sensor can not be located where external thermal...

Страница 15: ...e product For other constrains please refer to previous pages about the remote air temperature sensor Do not connect external electric loads Wire 220V AC 24V AC and 220V GND 24V GND should be used onl...

Страница 16: ...g pipe proper 8 Are the nilometer of water tank water temperature indicator controller manometer pressure relief valve and automatic discharge valve etc installed and operated properly 9 Does power su...

Страница 17: ...ce firstly Recheck the phase sequence before start up to avoid reverse rotation of the compressor which may damage the unit 4 Apply the universal electric meter to measure the insulation resistance be...

Страница 18: ......

Отзывы: