Unit Installation

1.Installation Guides

WARNING!

 Installation should be performed by GREE appointed servicemen, or improper installation would lead to 

unusual operation, water leakage, electric shock or fire hazard.

 The unit should be installed on the foundation which is capable of supporting the unit, or the unit would fall 

off or even lead to personal injury. 

 All electric installation should be done by electrician in accordance with local laws and regulations, as 

well as the User’s Manual and this Service Manual. Besides, the special power lines should be used, as any 

improper line would lead to electric shock or fire hazard.

  All electric lines should be safe and secured reliably. Be sure the terminal board and electric lines will not 

be affected by any external force, or it would lead to fire hazard.

 The electric lines should run properly to make the cover of the electric box secured tightly, or it would 

cause the terminal board overheated or cause electric shock or fire hazard.

 Cut off the power supply before touching any electric element.

CAUTION!

 The unit should be grounded properly and the ground line is not allowed to connect with the gas line, 

water line, lightning rod or phone line. 

 The breaker should be installed, or it would lead to electric shock. 

 The drain pipe should be installed in accordance with the User’s Manual and this Service Manual to 

ensure free drainage, and the drain pipe should be insulated against condensation. Once the drain pipe is 
installed improperly, it would lead to water leak which then will damps the ceiling and furniture. 

 Do not place the unit where there is oil fog, like kitchen, or the plastic would be aged, broken off or the 

polluted evaporator would lead to water leak and poor performance. 

 Do not place the unit where there is corrosive gas (like sulfur dioxide), or the corroded copper tubes or 

welded joint would lead to refrigerant leakage. 

 Do not place the unit where there is inflammable gas, carbon fiber, inflammable dust or volatile 

combustible, as they would lead to fire hazard.

SAFETY!

 Always use safety outfits at the construction site. 

 No smoking and no drunken operation are allowed at the construction site. 

 Wear no gloves and tighten the cuff when operating the machinery and electrical equipment. Do not 

maintain it during operation. 

 Use the abrasive-disk cutter and stand at the side of the rotating abrasive disk. 

 Clean the opening when installing the riser pipe, and then cover it tightly. Do not throw down any material. 

 The use of the electric and gas welders should be approved firstly. Once used, a fire distinguisher should 

be prepared and a service man should be there always. There should be no inflammable and explosive 

substances around the welding site. 

 A platform should be set up when working high above the ground.

1.1  Installation Positions of the Mini Chiller

(1). Avoid direct sunshine.

(2). Monobloc unit must be installed on a firm and solid support.
(3). Ensure the hanger rod, ceiling and building structure have sufficient strength to support the weight of air 

conditioner unit.

(4). Avoid placing the monobloc unit under window or between two constructions, hence to prevent normal 

operating noise from entering the room.

(5). Air flow at inlet and outlet shall not be blocked.
(6). Install at a well-ventilated place, so that the machine can absorb and discharge sufficient air.
(7). Do not install at a place where flammable or explosive goods exist or a place subject to severe dust, 

Содержание HLR10Pd/Na-K

Страница 1: ...Change for life GREE ELECTRIC APPLIANCES INC OF ZHUHAI Mini Chiller Unit Installation eries...

Страница 2: ...cation 6 4 4 Outline Dimension of the Mini Chiller 7 4 5 Installation Clearance Data 8 4 6 Electric Wiring 8 4 7 Wiring of the Terminal Board 9 4 8 Wiring of the 2 Way Valve 10 4 9 Wired Controller 11...

Страница 3: ...kitchen or the plastic would be aged broken off or the polluted evaporator would lead to water leak and poor performance Do not place the unit where there is corrosive gas like sulfur dioxide or the...

Страница 4: ...cording to installation manual 3 Do not connect to power until all installation work is completed 2 Filed Supplied Pipes and Valves Name Picture Usage Water Filter It is used to remove foreign matters...

Страница 5: ...nstallation Examples CASE 1 Connection of Terminals for Heating and Cooling Under floor Loop Fan Coil Unit and Radiator B M Under Floor Coil FCU 1 T Radiator B T Bypass valve field supplied High tempe...

Страница 6: ...maged The AC contactor control signal input terminal X17 AC contactor 1 and X18 AC contactor 2 of the main board AP1 should be connected to terminal 7 and terminal 8 of the electric box The single pin...

Страница 7: ...Installation Diagramof the Electric Heater with the thermostat 2 See the following statement for installation of two groups of auxiliary electric heaters including wiring of the AC contactors and the...

Страница 8: ...eet actual demands should be avoided Never open the electric box for wiring of the mainboard by the user themselves 4 2 Pre Installation 1 Installation of the unit must be in accordance with national...

Страница 9: ...7 Unit Installation 4 4 Outline Dimension of the Mini Chiller HLR8Pd Na K HLR10Pd Na K 1390 412 361 388 890 HLR12Pd Na M HLR14Pd Na M 367 340 1390 1430...

Страница 10: ...ng and moving must be 40 below to prevent center of the unit from moving 2 The monobloc unit should be installed on concrete base that is 10cm height 3 Requirements on installation space dimension of...

Страница 11: ...9 Unit Installation HLR12Pd Na M HLR14Pd Na M 4 7 Wiring of the Terminal Board HLR8Pd Na K HLR10Pd Na K...

Страница 12: ...ow Yes NC 2 wire 230V 50Hz 1Ph AC Closing water flow Yes Opening water flow Yes 1 Normal Open type When electric power is NOT supplied the valve is open When electric power is supplied the valve is cl...

Страница 13: ...ram At the field installation it should be wired at the terminal board of the 2 way valve 1 4 9 Wired Controller Wired controller wiring guidance 4 10 Wiring of Other Auxiliary Heat Sources Other auxi...

Страница 14: ...loor is approximately 1 5 meters Remote air temperature sensor can not be located where the area may be hidden when door is open Remote air temperature sensor can not be located where external thermal...

Страница 15: ...e product For other constrains please refer to previous pages about the remote air temperature sensor Do not connect external electric loads Wire 220V AC 24V AC and 220V GND 24V GND should be used onl...

Страница 16: ...g pipe proper 8 Are the nilometer of water tank water temperature indicator controller manometer pressure relief valve and automatic discharge valve etc installed and operated properly 9 Does power su...

Страница 17: ...ce firstly Recheck the phase sequence before start up to avoid reverse rotation of the compressor which may damage the unit 4 Apply the universal electric meter to measure the insulation resistance be...

Страница 18: ......

Отзывы: