ERV+DX coil
22
3) Gasket should be used for the thermal insulation of the pipe clamp and hose.
(Thermal insulation should be done after the drainage test.) See the
diagram below.
Unit: mm
4) If multiple drainage pipes are connected within a system, as show below,
please select a drainage header that matches the capacity of the unit.
Unit: mm
5) Please install water traps according to the following drawings.
6) Each unit should have one water trap.
7) Water traps should be installed in a way that is easy for cleaning.
8) Horizontal pipes must not be connected with vertical pipes of the same level.
Connect them in the following way:
a) Below is the 3-way connection of drainage pipes.
b) Below is the connection of water bends.
c) Below is the connection of a horizontal pipe.