25
© Copyright, GREE Canada, 2021
© Copyright, GREE Canada, 2021
1) Install accordion panel sub-assy. After finishing installation, measure the width L
between outer case of air conditioner and window frame.
Sponge Sticking Method and Procedures
L
L
2) Take out foam insulation from the package. Cut off the foam insulation in rectangular
shape with scissors.
3) Stick foam insulation evenly on the accordion panel and the screen of window frame.
The redundant 2~3mm of foam insulation in height can be stuffed into the frame for
fixing.