98
Installation and Maintenance
Service Manual
Procedure
Step
11. Remove clapboard
Remove the screws fixing clapboard and
then remove the clapboard.
10. Remove valve support
Screw off the bolts fixing the valve support
and valves, and then remove the valve
support.
Cutting the pipeline of the welding gas valve
and the liquid valve, and remove the gas
valve and the liquid valve.
Note:
When cutting weld, wrap the valve with wet
cloth completely to avoid damaging the valve
due to high temperature.
13. Remove gas valve and liquid valve
valves
welds
cut off valve
valve support
sub-assy
bolts
bolts
Clapboard Sub-Assy
screws