3PYPA
Table of Contents
Index
Preparation and Setup
Great Plains
| 401-647M | 2019-06-11
Table of Contents
Index
17
Refer to Figure 4 on page 16
11. Connect the flexible top link
only for field
operations and maintenance (never for transport).
Adjust the top link with the tractor turnbuckle and the
sliding link
.
For field operations, adjust the top link so that it is
slack with the planter lowered, and taut near the top
of hitch travel with the planter raised. The goal is to
reduce the weight borne by the rear lift assist
cylinders, and reduce any tendency for the tires to
dig on end-of-pass turns and during backing.
12. Raise tractor 3-point just enough to relieve pressure
from the bases of the parking stands.
Electrical Hookup
Refer to Figure 6
Your planter is equipped with several standard and
optional devices that require separate electrical
connections. For future reference, note any optional
connectors on this checklist.
Lighting connector (standard)
Monitor connector (standard)
Steering connector (standard)
__________________________
__________________________
__________________________
Make sure tractor is shut down with accessory power off
before making connections.
These connections may be made in any order. The key
requirement is that all connections be made prior to
planter movement.
Consoles and switch control boxes should be
mounted in your tractor cab in a location with easy
access. Route wiring harnesses with enough slack to
allow for tractor movement, especially on articulating
tractors.
3
4
Figure 6
Connector Identifica
1
2
3
1
2
3
Содержание Yield-Pro 3PYPA
Страница 188: ...Great Plains 401 647M 2019 06 11 Table of Contents Index 184 3PYPA Table of Contents Index Appendix R Row Pro...
Страница 194: ...Great Plains 401 647M 2019 06 11 Table of Contents Index 190 3PYPA Table of Contents Index...
Страница 195: ...Table of Contents Index Table of Contents Index...
Страница 196: ...Great Plains Mfg 1525 E North St P O Box 5060 Salina KS 67402 Table of Contents Index...